Laserfiche WebLink
g <br />o <br />eg. <br />@ <br />m- <br />o <br />d-o <br />F <br />6{ <br />oN('{@@?eq <br />6NoEs <br />oNmo@6 <br />oE <br />ALS $ 10,500.00 00 <br />$ 81.600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$$ 50.000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ 88,800.00 <br />$ <br />$ <br />$ 7.344.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />LABOR <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ 7.747.OO <br />$ 301.193.00 <br />$ 1.524.00 <br />$ <br />$ 43.835.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />MATERIAL <br />COST <br />$ 762.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$$ 8.000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />SUB <br />COST <br />$ 3.500.00 <br />$ 2.000.00 <br />$ 2.500.00 <br />$ 2.500.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />EQUIP <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />200.00 <br />LABOR <br />50,000.00 <br />88,800.00 <br />102.00 <br />102.00 <br />3,s00.00 <br />2.000.00 <br />2.500.00 <br />2,500.00 <br />EQUIP <br />43,835.00 <br />$ 762.00 <br />$ 7,747.OO <br />$ 301,193.00 <br />$ 1.524.00 <br />UNIT COSTS <br />Mat. <br />LS <br />HRS <br />HRS <br />EA <br />EA <br />EA <br />HRS <br />UNIT <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />800 <br />72 <br />1 <br />1 <br />1 <br />40 <br />QUAN <br />Manufacturer Representative <br />Mobile Weldinq <br />Scaffoldinq Labor <br />Scaffoldino Rental <br />DESCRIPTION <br />Architecturan Daylighting Group 25mm Polycarb <br />Submittals <br />ht Materials <br />Sealant <br />Hardware and Fasteners <br />Vallev Steel Works <br />Structural Steel <br />Fabrication <br />Lifi Rental <br />Belsaas and Smith <br />lnstallation - 5 Carpenters x 4 wks @$102/hr <br />Forklift - Month Rental <br />Telehandler - Month Rental <br />c.o.P.#2SHEET 1 of 2 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />BELSAAS & SMITH CONSTRUCTION <br /># <br />BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 <br />$ 8,000.00 <br />c.o.P.#2