My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 6 Fully Executed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 6 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 12:19:15 PM
Creation date
4/3/2026 12:19:02 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G <br />P.O. Box tto <br />Wenatchce, llVA. 08807{l l9 <br />Phonr 60t.882.7'll9 <br />Fax 00t{62.0380 <br />County Comissioners <br />West Sth Ave, Suite 108 <br />Ellensburg, WA 98926 <br />MAKE CHECKS PAYABLE TO: <br />cascadc Ccntral Conslruction, LLC <br />P.O Box {{9 <br />Wonaichcc, WA. 98807{ll 19 <br />PROPOSAL <br />PROJECT: Ellcnsbulg Rod3o Aicna lmprorramrntE <br />coP# 19 <br />DATE: Matah 9,2028 <br />TITLE: Ehcrkd lftlllty Planc Rcv.l <br />CASCADE <br />CENTRAL <br />Ddt DB8CRIPNOI ouAt{tfllY uoil UM' PRICE Atoultr <br />ugt20m Suboontractor Coat <br />Earthuork Subcontraclor - See attached Back-up 1 LS $18,060,00 $7,806,00 <br />Ebc'trical Subcontractor - soa attachsd Becl(-up 1 LS $33,306,00 $7,614.00 <br />6% Mark-uF gdo 80 <br />Subconlractor - Sub Total 16.820.80 <br />gst20a Caccad. C.ntal Constuction Cost <br />Sup€rvision 6 HR $12E.'t6 s1,025.44 <br />Ggnaral Conditions U wu $925.00 $o.oo <br />Prcject Managpmont & coordination 4 HR $191.54 $040.16 <br />Projec-t Engineer 4 Ht<$114.25 $465.00 <br />Labor6r 0 HR $03.08 $0.00 <br />Carpentor 0 HR $1 19.00 $0.00 <br />15% Mark-utr 320.45 <br />G6n6ral Crntractor - 9Ub Total 2 457 09 <br />ttumotat 19 077 a9 <br />HOnd slal ,4 <br />EtaT 09 <br />'19 528 2? <br />uw20re Concrcir Enaccm.nt Crcdit Pal RFI 0t2 Rcspons. <br />Cemont Mason -2 HR $41./6 ($163.501 <br />Concrete CY $250.00 ($500.001 <br />(603. <br />1U.UgZ.tst <br />Qualificatiom: <br />lnclud.d: <br />-Excavation and backfill for duc,t, vault, tansformgr, primary conductoF, and trench from metgr oatinst to io now transfiormsr <br />-Ecology Blocks <br />€onduit and Wra frpm mater cabinEt to nstvtransformer <br />Excludcd: <br />.gy utility provider: All removal and domo. Supply and install of duct, vault, transformer, and primary conductors/conduit. <br />Concrete oncasemgrt from metor cakinot to utility tranformar vault <br />.Utility tee6. <br />Sch.dulc impecl: Nons. Excluding any potential lead tim€s or schaduling a$ociatsd with utility scop€ of rcrk. <br />TH ANK YOU FC'R YOUR AUS"VESSI
The URL can be used to link to this page
Your browser does not support the video tag.