My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 6 Fully Executed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 6 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 12:19:15 PM
Creation date
4/3/2026 12:19:02 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .. aMrc"-r <br />Er I L:__l\ tr< f]{t I i Nt s 1-!? II l:;'} ; iui t.l <br />Dally Report of Force Account Workod <br />3ontract Number lDate lltem NumberI wnozal <br />Item Name <br />3' Gste Valve Assembl! <br />trime Conlracior <br />Cas csde Cenlrul Cowtruction <br />Subconlractor/Lower Tlor Subconlractor <br />Selhnd Construction, Inc. <br />)escriplion of Worfi Performed <br />3' Gate Valve ossembly <br />Workers and/or Equlpment <br />WorklnE Occupation of Workers or Equlpment Slze <br />Houra vorked <br />Reg, Rate O.T. Rate Amount <br />Reo-o.T. <br />I Foreman 2.0 $102.61 8205.22 <br />2 0perator (2 3 I Excavator)$100.07 $0,00 <br />3 Op er ator ( 1 3 I Exc avato r)4.0 8100.07 M00.28 <br />4 Operator (Loader)8100.07 80.00 <br />5 Operalor Mini Exc)$100.07 s0.00 <br />6 0peralor (Skid Steer)$100.07 80.00 <br />7 Operalor (Rollcr)$94.82 $0.00 <br />8 Pipe Layer 4.0 $6607 $264.28 <br />o Pipe Layer (Topman)4.0 $6607 $264.28 <br />10 General Loborer 862.45 80.00 <br />'t'l $0.00 <br />Labor Subtotal $1,134.06 <br />15% Markup $170.1 I <br />Labor Total $1,304.17 <br />12 238 Excantor s|37.12 80.00 <br />13 138 Excwator 4.0 8124.46 $497.84 <br />14 [-oader $84.33 $0.00 <br />15 Mini Excavator $5610 $0.00 <br />16 Skid Steer $80.18 80.00 <br />17 Roller 825.32 80.00 <br />18 Plckup 2.0 843.80 887.60 <br />19 l-Ton 4.0 M7.22 $188.88 <br />Subtotal $774.32 <br />1595 Markup 8r 16.ls <br />Equipmenl Total $890.47 <br />Materials <br />20 Gate Valve I s763.84 $763.84 <br />21 Gaghets ,$12.42 824.84 <br />22 F'Iange Adapter 2 819.71 839.42 <br />23 BakupNng t 810.80 $21.60 <br />24 Bolt Kil 2 86.13 812.26 <br />25 Saddle 3x$/4n 1 $178.33 $178.33 <br />26 3/4u -1/2' Bushing 1 $4.03 $4.03 <br />27 I/2" Valve I $36.28 83628 <br />28 Valve Box I $107.00 $107.00 <br />29 Valve Top I $64.80 864.80 <br />30 Valve Box Lid 1 830.28 $30.28 <br />Materials Subtotal $1,282.68 <br />15oh Markup $192.40 <br />Materials Total $1,475.08 <br />By <br />Total $3,669.72
The URL can be used to link to this page
Your browser does not support the video tag.