My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 6 Fully Executed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 6 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 12:19:15 PM
Creation date
4/3/2026 12:19:02 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEIIAND P.O. Box ll9 Womiohes, WA 98807 <br />Phonp: (509)662-7119 Fu: (509)662-4,165 <br />Bld Date:March 4,2026dr'^l;;;;Tffi <br />Ellensburr Rodeo Arena lmorovements -HDPE vs Conoer Credlt <br />Ouallflcatlons: Please Read Carefullv <br />1. washlngton State Sales Tax has been not been lncluded ln proposal. <br />2. Prevalllng wage has been accounted for ln proposal. <br />3. Rock €xcavatlon (1,e. Solld Rock, Callche, Hard Pan, Cemented Solls and/or Boulders larger than 1 Cublc Yard) have not been lncluded, Prlce Negotlatlon wlll be <br />requlred lfthese matealals a.e encountered, <br />4. Over Excavatlon of Unsuhable Material has not been accounted for, price negotlatlon wlll be requlred lfthese materlals are encountered. <br />5, Excludes Water System Support. <br />6. Exludes Constructlon Survey. <br />?, Englneerlng & Professlonal Surveylng Servlces are Excluded. <br />8, Fees for Utllhles, County, Ot% Etc. are not lncluded, Cuhural Resource Servlces are not covered in our scope, <br />9, Hazardous Materlals Abatement, Removal, Handllng, Dlsposal, etc, ar€ not expected onslte and are therefore Excluded, <br />10. waterlng & Dust Control are lncluded for Selland's scope of work and duratlon only, No OT Dust Control or beyond our work. <br />11. Eroslon Control lnspectlons, Reportlng, Monltoring & Malntenance are Excluded. Stormwater Permlt by others. <br />12, Dust control has been provlded while we are actlvely worklng the slt€. No permanent or sustalned dust control or mltlgatlon has been lncluded. <br />13, Any scope ofwork not speclflcally lncluded as a llne ltem ln thls proposal ls excluded. <br />14, Actual quantltlas lnstalled shall be tracked/measured and the basis of payment at the unlt prices included ln thls proposal unless otherwlse agreed. <br />15, Due to global supply chaln dlsruptlons and mark€t volatlllty we res€rve the exclusive rlght to adjust our proposal for materlal escalatlon. <br />16. Proposal ls valld for 30 days. Thls proposal shall be made part of any subcontract. <br />lf you have any questlons or need addltlonal lnformatlon wlth regard to our proposal please glve us a call, <br />Slncerely, <br />sEu.AND coNsrRucnoN, rNc. <br />c,-:V*a-./ '/ <br />James Flowerg <br />(s09) 881-0339 <br />tI HDPE <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.