Laserfiche WebLink
ATTN: General Contractor <br />Concrete Estimate - RFP 06 <br />Estlmatc Datf : 21 25 | 2026 <br />Project Location <br />Ellensburg, <br />Washington <br />Rodeo I mentsEI <br />Itom Work Deacrlptlon Clesc quantlty unlt unlt Prlco Amount (US $) <br />1 <br />2 <br />3 <br />4 <br />5 <br />Forms, Stakcs, Small Tools, Exp Jolnt, <br />Rcedy Mlx Concr.tc <br />ilrt Rcbar & fi5 Rebar Dolt&ls <br />Cemcnt Mason <br />lronwprkcr <br />Mat€rlal <br />Materlal <br />Materlal <br />Labor <br />Labor <br />lncludcsr <br />397sf of 6in Thick Concrete Sidewalk <br />Forming, Pourlng of Concrete Sidewalk <br />#4 Rebar @18in OC EW <br />#5 Smooth Rebar Dowels @24in OC Per Detail 10/5-201 <br />1 <br />8 <br />I <br />36 <br />7 <br />EA <br />CY <br />EA <br />HR <br />HR <br />s <br />s <br />$ <br />s <br />$ <br />312.56 <br />255.75 <br />241,.80 <br />65,71 <br />86.56 <br />$ <br />s <br />s <br />s <br />s <br />3t2.55 <br />2,046.00 <br />241.80 <br />2,365,56 <br />60s.92 <br />Customer: <br />Authorized Signature:- <br />Date of <br />tones Concrete & Excavation <br />Estimator - Carson Chester <br />s41-861-8060 <br />Sub Total $ s,szt,gc <br />O&P Markup 15.00%835.78 <br />TOTAL $ 6,&7.62 <br />www.JonesConcrete.pro llt