Laserfiche WebLink
BIDTABS <br />2026 ANNUAL PAINT STRIPE PROJECT <br />4 <br />3 <br />2 <br />t <br />Item S <br />SCHEDUTE A (COUNW ROADS) <br />275.68 <br />2.47 <br />305.77 <br />2LO.? <br />Quantiw <br />MI <br />MI <br />MI <br />MI <br />Unit <br />4" WHITE (SOLIDI EDGE & TURN TANES <br />4' WHITE {SKIP) CENTERLINE <br />4'YELLOW (SOUD) "NO PASSING ZONE' <br />4" YETLOW {SKIPI CENTERUNE STRIPE <br />Pavement Markings <br />S s83.oo <br />S zra.go <br />s 506.00 <br />S 247.s0 <br />Unit Cost <br />ENGINEERS ESNMATE <br />s t60.721.44 <br />S 453.12 <br />s 154.719.62 <br />s s2,049.25 <br />Total cost <br />s 535.00 <br />5 550.00 <br />s 465.00 <br />s 235.00 <br />Unit Cost <br />Specialized Pavement <br />Markin8 l-Lc <br />s 147.488.80 <br />S 1,138.s0 <br />s 142.183.05 <br />s 49.420.50 <br />Total Cost <br />s 700.00 <br />s 350.00 <br />s 1,135.00 <br />s 3s0.00 <br />Unit Cost <br />Cgnstrustion Ahead ln€ dba <br />Pavement sudace Conkol <br />S 192.978.00 <br />s 724.50 <br />s 347.048.95 <br />s 73.60s.00 <br />Total Cost <br />I <br />7 <br />6 <br />5 <br />Item # <br />SGHEDU|E B (C|TY OF ETT."ENSBURG <br />0.19 <br />20.47 <br />50.97 <br />5.L2 <br />Quantity <br />MI <br />MI <br />MI <br />MI <br />Unit <br />4,'WHITE SKIP <br />4" WHITE ISOTID'I EDGE & TURN LANES <br />4" YELLOW (SOLIDI "NO PASSING ZONE" <br />4, YELLOW {sKIP} CENTERLINE STRIPE <br />Pavement Markinss <br />S 324.s0 <br />s 825.00 <br />5 71s.00 <br />s 324.s0 <br />Unit Cost <br />s 61.66 <br />s 16.838.25 <br />s 35.443.ss <br />s 1.561.44 <br />Total Cost <br />5 310.00 <br />s 775.00 <br />s 650.00 <br />s 310.O0 <br />s 58.90 <br />s 15.817.75 <br />s 33.130.s0 <br />s 1-587.20 <br />s 350.00 <br />s 700.00 <br />s 1,135.00 <br />s 350.00 <br />s 66.s0 <br />s 14.287.00 <br />s s7.8s0.9s <br />s \.792,OO <br />Unit Cost <br />Unit Cost <br />Total cost Unit Cost <br />Cost <br />Unit Cost <br />Total Cost <br />Total Cost <br />Total Cost <br />10 <br />9 <br />Item # <br />SCHEDUI"E C OF KITTIT <br />2.9 <br />3.42 <br />Quantiw <br />MI <br />MI <br />Unit <br />4" WHITE {SOLIDI EDGE & TURN LANES <br />4" YELLOW (SOLIDI "NO PASSING ZONE" <br />Pavement Markings <br />s 880.00 <br />S zzo.oo <br />Unit Cost <br />s 2.552.00 <br />s 2.633.40 <br />Total Cost <br />s 800.00 <br />s 800.00 <br />s 2.320.00 <br />s 2.736.00 <br />s 700.00 <br />s 1.135.00 <br />s 2.030.o0 <br />s 3.881.70 <br />t2 <br />11 <br />Item S <br />SCHEDUU D {TOWN OF SOUTH CrE ELUM) <br />2.3 <br />2.3 <br />Quantitv <br />MI <br />MI <br />Unit <br />4.' WHITE (SOLIDI EDGE & TURN LANES <br />4" YELLOW {SOLIDI "NO PASSING ZONE'' <br />Pavement Markings <br />S 88o.oo <br />S 77o.oo <br />Unit Cost <br />S 2.oz4.oo <br />s 1.771.00 <br />Total Cost <br />s 800.00 <br />s 800.00 <br />s 1.840.00 <br />S 1.840.00 <br />5 700.00 <br />s 1.135.00 <br />S 1.610.00 <br />s 2.610.50 <br />Est. <br />Engineered Estimated Range: S 410,332.29 S 453,525.15 <br />Bids have been reviewed for ac€uracy, unbalancing of bid ibmsJabulalbns have been checked and conf.med. <br />D Ct+-[-- 3/d /zt, <br />PROJECT BID:43 73 10