My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE TABLE OF CONTENTS <br />JUNE 2023 00 01 10 - 1 <br />©COPYRIGHT 2023 JACOBS <br />TABLE OF CONTENTS <br />Pages <br />SPECIFICATIONS <br />DIVISION 01—GENERAL REQUIREMENTS <br />01 11 00 Summary of Work .................................................................... 1- 2 <br />01 31 13 Project Coordination ................................................................ 1- 6 <br />01 31 19 Project Meetings ...................................................................... 1- 3 <br />01 50 00 Temporary Facilities and Controls ........................................... 1- 10 <br />01 57 13 Temporary Erosion and Sediment Control .............................. 1- 14 <br />DIVISION 02—EXISTING CONDITIONS <br />02 41 00 Demolition ............................................................................... 1- 3 <br />DIVISION 03 THROUGH DIVISION 30 (NOT USED) <br />DIVISION 31—EARTHWORK <br />31 10 00 Site Clearing............................................................................. 1- 3 <br />31 23 13 Subgrade Preparation ............................................................... 1- 3 <br />31 23 16 Excavation................................................................................ 1- 4 <br />31 23 23 Fill and Backfill ....................................................................... 1- 7 <br />31 23 23.15 Trench Backfill ........................................................................ 1- 8 <br />31 32 00 Soil Stabilization ...................................................................... 1- 6 <br />DIVISION 32—EXTERIOR IMPROVEMENTS <br />32 11 23 Aggregate Base Courses .......................................................... 1- 6 <br />32 31 13 Chain Link Fences and Gates .................................................. 1- 9 <br />DIVISION 33 THROUGH DIVISION 49 (NOT USED) <br />DRAWINGS (BOUND SEPARATELY) <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.