My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Execution and Closeout Requirements <br /> <br /> 017000 - 3 <br />G. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, drainage <br />systems, and etc. <br />H. Clean site; sweep paved areas, rake clean landscaped surfaces. <br />I. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; <br />dispose of in legal manner; do not burn or bury. <br />3.08 CLOSEOUT PROCEDURES <br />A. Make submittals that are required by governing or other authorities. <br />B. Accompany Engineer on preliminary inspection to determine items to be listed for completion or <br />correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial <br />Completion. <br />C. Notify Engineer when work is considered ready for Engineer's Substantial Completion <br />inspection. <br />D. Submit written certification containing Contractor's Correction Punch List, that Contract <br />Documents have been reviewed, work has been inspected, and that work is complete in <br />accordance with Contract Documents and ready for Engineer's Substantial Completion <br />inspection. <br />E. Conduct Substantial Completion inspection and create Final Correction Punch List containing <br />Engineer's and Contractor's comprehensive list of items identified to be completed or corrected <br />and submit to Engineer. <br />F. Correct items of work listed in Final Correction Punch List. <br />G. Notify Engineer when work is considered finally complete and ready for Enginee's Substantial <br />Completion final inspection. <br />H. Complete items of work determined by Engineer listed in executed Certificate of Substantial <br />Completion. <br />3.09 MAINTENANCE <br />A. Provide service and maintenance of components indicated in specification sections. <br />B. Maintenance Period: As indicated in specification sections or, if not indicated, not less than <br />one year from the Date of Substantial Completion or the length of the specified warranty, <br />whichever is longer. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.