Laserfiche WebLink
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Administrative Requirements <br /> <br /> 013000 - 5 <br />1. Project record documents. <br />2. Operation and maintenance data. <br />3. Warranties. <br />4. Bonds. <br />5. Other types as indicated. <br />D. Submit for Owner's benefit during and after project completion. <br />3.10 NUMBER OF COPIES OF SUBMITTALS <br />A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up <br />file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected. <br />3.11 SUBMITTAL PROCEDURES <br />A. General Requirements: <br />1. Use a separate transmittal for each item. <br />2. Submit separate packages of submittals for review and submittals for information, when <br />included in the same specification section. <br />3. Sequentially identify each item. For revised submittals use original number and a <br />sequential numerical suffix. <br />4. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail <br />number; and specification section number and article/paragraph, as appropriate on each <br />copy. <br />5. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of <br />products required, field dimensions, adjacent construction work, and coordination of <br />information is in accordance with the requirements of the work and Contract Documents. <br />6. Schedule submittals to expedite the Project, and coordinate submission of related items. <br />a. For each submittal for review, allow 10 days excluding delivery time to and from the <br />Contractor. <br />7. Identify variations from Contract Documents and product or system limitations that may be <br />detrimental to successful performance of the completed work. <br />8. Provide space for Contractor and Architect review stamps. <br />9. When revised for resubmission, identify all changes made since previous submission. <br />10. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with <br />requirements. <br />11. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct <br />portion(s) of the work, and have received prior approval for their use. <br />B. Product Data Procedures: <br />1. Submit only information required by individual specification sections. <br />2. Collect required information into a single submittal. <br />3. Do not submit (Material) Safety Data Sheets for materials or products. <br />C. Shop Drawing Procedures: <br />1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting <br />Contract Documents and coordinating related work. <br />2. Generic, non-project-specific information submitted as shop drawings do not meet the <br />requirements for shop drawings. <br />3.12 SUBMITTAL REVIEW <br />A. Submittals for Review: Engineer will review each submittal, and approve, or take other <br />appropriate action. <br />B. Submittals for Information: Engineer will acknowledge receipt and review. See below for <br />actions to be taken. <br />C. Engineer's actions will be reflected by marking each returned submittal using virtual stamp on <br />electronic submittals. <br />D. Engineer's and consultants' actions on items submitted for review: