Laserfiche WebLink
I L 3 14 0 <br />_ GENERAL NOTES <br />NN N B <br />/ A. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL Q�w of WAS <br />TOPSOIL AND SEEDING OF DISTURBED AREAS N, �"�, <br />_ _ a co � r <br />B. ECOLOGY BLOCK WALL, OR SIMILAR AS APPROVED BY w d <br />PROPERTY BOUNDARY ENGINEER. <br />�0 48139 0 ww <br />�CISTER� 1� <br />Bl:t ;AAa b it hield,Elizabeth <br />SILT FENCE STREAMLINE Eliza NAN, �,z o�_USeasa'" <br />5602 I ---------_ jai zoza.be,oiBut elfi od jambe—, <br />- _ _ _ EROSION AND SEDIMENT AAB0009572 <br />A CONTROL NOTES m m 0- ui <br />Q LL <br />Q' <br />ui <br />1 1. FOR GENERAL INFORMATION AND FOR CONTRACTOR Q Q m <br />- TO ESTABLISH MINIMUM STORMWATER AND EROSION ~ <br />CONTROL MEASURES DURING CONSTRUCTION. m <br />SHEET C-402 <br />/ _ W <br />------------------------------------------ / 2. CONTRACTOR IS RESPONSIBLE FOR EROSION o <br />CONTROL, SEDIMENT CONTROL, AND STORMWATER > <br />----------- l <br />/ N � MANAGEMENT ON THE CONSTRUCTION SITE FOR THE Q <br />k I DURATION OF THE CONSTRUCTION PERIOD. <br />CONTRACTOR TO INSPECT EXISTING SITE p <br />CONDITIONS, INCLUDING, BUT NOT LIMITED TO, FLOW U) <br />PATTERNS, STABILIZATION MEASURES AND OTHER Lu <br />\ RIPARIAN MANAGEMENT ZONE PERTINENT INFORMATION RELATED TO STORMWATER <br />(STREAM BUFFER) AND SEDIMENT CONTROLS. THE SITE UNDER ITS Q <br />/ CURRENT CONDITION IS STABLE. CONTRACTOR TO co <br />/ MAINTAIN STABILIZATION OF SITE THROUGHOUT THE z Z <br />/ - ENTIRE CONSTRUCTION PERIOD AND LIMIT OPEN ui O Y <br />AREAS TO THE EXTENT POSSIBLE. w U <br />------------------ — <br />----------------- _ <br />p O <br />W <br />3. EROSION CONTROL MEASURES SHOWN SHALL BE � <br />p <br />ESTABLISHED, BUT MAY NOT BE ALL INCLUSIVE OF THE WQ <br />MEASURES REQUIRED. CONTRACTOR IS RESPONSIBLE o uj 0f <br />/ FOR INSTALLING ADDITIONAL MEASURES AS o o ui <br />NEEDED,MAINTAINING, AND THEN DECOMMISSIONING � � <br />~ ALL EROSION CONTROL MEASURES AT THE <br />U) U m <br />APPROPRIATE TIMES THROUGHOUT THE PROJECT o o m <br />DURATION. CONTRACTOR SHALL PREPARE A a 0- <br />STORMWATER POLLUTION PREVENTION PLAN (SWPPP) ui u <br />B k / / / AND FILE A NDI FOR A NPDES GENERAL PERMIT FOR <br />\ / STORMWATER DISCHARGES ASSOCIATED WITH N T o <br />CONSTRUCTION AND LAND DISTURBANCE ACTIVITIES. w w <br />� � 0 <br />AT THE CONCLUSION OF THE PROJECT, CONTRACTOR Q <br />SHALL FILE A NOi. REFER TO SECTION 01 57 13, <br />Lu <br />EROSION AND SEDIMENT CONTROL DURING co Q <br />I CONSTRUCTION. 2�! o Y <br />o <br />/ J / 4. CONTRACTOR WILL COORDINATE WITH COUNTY PRIOR z <br />/ TO CONSTRUCTION ACTIVITIES THAT WILL RESTRICT N O <br />ACCESS TO EXISTING ACCESS ROADS. z o <br />5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING <br />/ EXISTING DRAINAGE STRUCTURES. GRATES SHOULD <br />BE LINED WITH SEDIMENT CONTROL FABRIC TO <br />PREVENT EXCESS SEDIMENT FROM ENTERING. Z O <br />y <br />6. CONTRACTOR SHALL ENSURE ACTIVE CONSTRUCTION F- z <br />_ AND EXCAVATION AREAS ARE PROTECTED BY — <br />WATTLES OR OTHER APPROVED TESC METHODS AS Q z <br />Fo NEEDED TO DIRECT STORMWATER AWAY FROM o <br />k EXCAVATIONS OR REMOVE SEDIMENT FROM RUNOFF _ U <br />FROM THESE AREAS. Z � cf) <br />Q Z Q <br />WHITE GOODS ECOLOGY BLOCK 7. CONTRACTOR SHALL ENSURE THAT NO VEHICLES 0 <br />/ / \ WALL 2 40x20 FEET BAYS LEAVING THE FACILITY TRACK MUD OR OTHER DEBRIS U �_ <br />ONTO THE PUBLIC ROADWAYS. CONSTRUCT A Q Y <br />960 STABILIZED TRUCK ENTRANCE, IF NECESSARY ALSO W <br />ELECTRICAL, SEE / I `� CONSTRUCT A TEMPORARY WHEEL WASH STATION. <br />S E�T E-101I i DEMO EXISTING 8. WATER FROM ANY DEWATERING OPERATIONS SHALL U Y <br />C / / SCALE REMOVE AND REPLACE FENCE, BE DIRECTED TO SEDIMENT TRAPS BEFORE <br />/ I I `INSTALSECURITY GATE 2 DISCHARGING INTO EXISTING STORMWATER SYSTEM. <br />9. ALL DISTURBED AREAS SHALL BE PERMANENTLY <br />EXIT ONLY 0I a / s6o2 STABILIZED PER SECTION 31 32 00, SOIL <br />(MERGE TO I o x a STABILIZATION. <br />THRU TRAFFIC 10. AT CONCLUSION OF PROJECT, CONTRACTOR SHALL <br />ON TO <br />ROAD)2-WAY I ° ° N ° REMOVE ALL SEDIMENT IN INFILTRATION AREAS, AND Q Z <br />° 9602 DITCHES. W <br />:::a <br />It <br />O SHEET KEYNOTES o w <br />�� Vl <br />x x - zoo <br />/ D 1. DEMOLISH STRUCTURE AND ASSOCIATED <br />r ELECTRICAL PER SPECIFICATION SECTION 02 41 00B J _3Z Z <br />DEMOLITION O >_ Q J <br />I / g6 <br />I DEMO EXISTING �� u U w Z o <br />// // // // // // // // / // �� Imo/ CONCRETE PAD 1 2. REPLACE WITH SIMILAR FENCE AND GATE (REUSE <br />2100 GATE FROM ROAD RELOCATION IF POSSIBLE) PER ~ 0 <br />X —max I DEMO EXISTING EXISTING ASPHALT 4J SPECIFICATION 32 31 13 INSTALL TEMPORARY FENCE ' (n () Z <br />BUILDING IF NEEDED TO PRESERVE RESTRICTED ACCESS TO ' J 00 <br />SILT FENCE I 1 PROPOSED ONE WAY SITE Q � U <br />ENTRANCE/Zogo 3. RETAIN ACCESS TO NEIGHBOR PROPERTY w <br />SILT FENCE DEMOLISH AND <br />- — REVEGATE ROAD "� 4. PROTECT EXISTING ASPHALT, SMOOTH IN EXISTING > Z <br />— — T-BUI, — — _ x / AND PROPOSED ASPHALT O Q <br />�- — T-BUR 2095El — N <br />T-BUR <br />S6p� 02 INSTALL FENCE �— — z� t <br />VERIFY SCALE <br />BAR IS ONE INCH ON <br />SHEET C-401 WA-903 HIGHWAY 0 40 80 120 ORIGINAL DRAWING. <br />0 1't <br />— — — — — — — 1" = 40' DATE FEBRUARY 2024 <br />SHEET C-400 - , PROJ KITTC002 <br />DWG C-101 <br />SHEET 5 of 18 <br />01 u <br />w <br />O <br />wUj <br />am <br />00 <br />�U <br />a <br />wQ <br />=w <br />�O <br />cf)Z <br />w0 <br />UQ <br />Lu� <br />u0 <br />Q� <br />ZD <br />OQ <br />�-)Z <br />U)w <br />w~ <br />L� <br />w <br />w <br />o� <br />wp <br />ZU <br />w <br />ao <br />U� <br />a <br />z� <br />w <br />w= <br />w0 <br />oQ <br />�--Of <br />QO <br />Of1 <br />0- <br />O� <br />o< <br />U <br />ZZ <br />U 0� <br />Z0 <br />LDw <br />(n J <br />w <br />0� <br />z <br />Qz <br />�o <br />Qw <br />wU) <br />95 <br />ww <br />=m <br />po <br />z� <br />QO <br />�Z <br />Z cn <br />wo <br />�Z <br />�Q <br />0o U)0 <br />Z <br />w <br />2i <br />D <br />U <br />O <br />0 <br />w <br />0 <br />w <br />U) <br />D <br />w <br />'WURL $PWPATH FILENAME: KITTC002_004-C-101.dgn PLOT DATE: 07\25\2024 PLOT TIME: 4:03:45 PM <br />