My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NO: <br />DRAWING FILE NO: <br />DATE: <br />DESIGNER: <br />BY <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DRAWN BY: <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />OF <br />DRAWING NO: <br />SHEET NO: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />SEAL: <br />APPROVED BY: <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br /> <br />T <br />R <br />A <br />N <br />S <br />F <br />E <br />R <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />9 <br />2 <br />2 <br />JUNE 2025 <br />_22-000186 X-TLBK <br />18 <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />25 <br /> <br />N <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />3 <br />8 <br />, <br /> <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />8 <br />0 <br />1 <br />P: <br /> <br />5 <br />0 <br />9 <br />. <br />8 <br />8 <br />6 <br />. <br />3 <br />2 <br />6 <br />5 <br />SC <br />J <br />A <br />L <br />L <br />I <br />A <br />N <br />C <br />E <br />. <br />C <br />O <br />M <br />--/--/---- <br />SEC. 21, T 20 N., R 15 E., W.M. <br />CO <br />V <br />E <br />R <br /> <br />S <br />H <br />E <br />E <br />T <br />22-000186 CV-01 <br />CV-01 <br />J VERDUZCO <br />1 <br />K SHIFFLET <br />D IRELAND <br />SITE ADDRESS: <br />UTILITIES <br />OWNER / APPLICANT <br />CONSULTANTS <br />SITE INFORMATION <br />HORIZONTAL & <br />VERTICAL CONTROL <br />CLE ELUM, WA <br />ENTRANCE IMPROVEMENTS AND TANK REPLACEMENT PROJECT <br />A PORTION OF SEC 21, T20N., R15E., W.M. <br />CLE ELUM, WA <br />WA- <br />9 <br />0 <br />3 <br />NUM <br />B <br />E <br />R <br /> <br />5 <br /> <br />M <br />I <br />N <br />E <br /> <br />R <br />O <br />A <br />D <br />TANK REPLACEMENT <br />PROJECT SITE <br />CALL BEFORE YOU DIG <br />ENTRANCE IMPROVEMENTS <br />PROJECT SITE <br />GENERAL NOTES: <br />1. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE COUNTY PRIOR TO THE START OF <br />CONSTRUCTION. <br />2. UNLESS NOTED OTHERWISE, UTILITIES SHOWN ON THE PLAN ARE EXISTING, AND ARE LOCATED <br />TO THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL VERIFY PRIOR TO <br />CONSTRUCTION. IN THE EVENT OF A CONFLICT, THE CONTRACTOR SHALL COORDINATE WITH THE <br />ENGINEER. <br />3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF <br />ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO <br />CONSTRUCTION BY CALLING 811, THE UNDERGROUND LOCATE LINE, A MINIMUM OF 48 HOURS <br />(TWO WORKING DAYS) PRIOR TO ANY EXCAVATION. <br />4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A COPY OF THE APPROVED <br />CONSTRUCTION PLANS ON SITE AT ALL TIMES. <br />5. ANY CHANGES TO THE DESIGN SHALL FIRST BE REVIEWED AND APPROVED BY THE ENGINEER. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />CV-01 <br />QTY-01 <br />G-002 <br />C-100 <br />C-101 <br />C-201 <br />C-400 <br />C-401 <br />C-402 <br />C-501 <br />C-502 <br />C-601 <br />E-101 <br />E-501 <br />RM-01 <br />SP-01 <br />SP-02 <br />DT-01 <br />COVER SHEET <br />SUMMARY OF QUANTITIES <br />LEGEND, ABBREVATIONS, & GENERAL NOTES <br />OVERALL EXISTING SITE PLAN <br />OVERALL SITE PLAN, KEY MAP, AND EROSION AND SEDIMENT CONTROL PLAN <br />CENTERLINE PROFILE NEW ENTRANCE ROAD <br />ENLARGED PLAN NEW ENTRANCE ROAD <br />ENLARGED PLAN NEW ENTRANCE ROAD <br />ENLARGED PLAN TRAILER PARKING <br />SITE SECTIONS AND DETAILS <br />SIGNING AND STRIPING PLAN <br />TRAFFIC CONTROL PLAN <br />ELECTRICAL SITE PLAN <br />ELECTRICAL DETAILS <br />REMOVAL PLAN <br />OVERALL SITE PLAN <br />SITE PLAN <br />DETAILS <br />DWG <br />NO <br />SHEET <br />NO <br />SHEET NAME <br />INDEX TO DRAWINGS <br />01/22/26
The URL can be used to link to this page
Your browser does not support the video tag.