Laserfiche WebLink
JOB NO: <br />DRAWING FILE NO: <br />DATE: <br />DESIGNER: <br />BY <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DRAWN BY: <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />OF <br />DRAWING NO: <br />SHEET NO: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />SEAL: <br />APPROVED BY: <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br /> <br />T <br />R <br />A <br />N <br />S <br />F <br />E <br />R <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />9 <br />2 <br />2 <br />JUNE 2025 <br />_22-000186 X-TLBK <br />18 <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />25 <br /> <br />N <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />3 <br />8 <br />, <br /> <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />8 <br />0 <br />1 <br />P: <br /> <br />5 <br />0 <br />9 <br />. <br />8 <br />8 <br />6 <br />. <br />3 <br />2 <br />6 <br />5 <br />SC <br />J <br />A <br />L <br />L <br />I <br />A <br />N <br />C <br />E <br />. <br />C <br />O <br />M <br />--/--/---- <br />SEC. 21, T 20 N., R 15 E., W.M. <br />CO <br />V <br />E <br />R <br /> <br />S <br />H <br />E <br />E <br />T <br />22-000186 CV-01 <br />CV-01 <br />J VERDUZCO <br />1 <br />K SHIFFLET <br />D IRELAND <br />SITE ADDRESS: <br />UTILITIES <br />OWNER / APPLICANT <br />CONSULTANTS <br />SITE INFORMATION <br />HORIZONTAL & <br />VERTICAL CONTROL <br />CLE ELUM, WA <br />ENTRANCE IMPROVEMENTS AND TANK REPLACEMENT PROJECT <br />A PORTION OF SEC 21, T20N., R15E., W.M. <br />CLE ELUM, WA <br />WA- <br />9 <br />0 <br />3 <br />NUM <br />B <br />E <br />R <br /> <br />5 <br /> <br />M <br />I <br />N <br />E <br /> <br />R <br />O <br />A <br />D <br />TANK REPLACEMENT <br />PROJECT SITE <br />CALL BEFORE YOU DIG <br />ENTRANCE IMPROVEMENTS <br />PROJECT SITE <br />GENERAL NOTES: <br />1. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE COUNTY PRIOR TO THE START OF <br />CONSTRUCTION. <br />2. UNLESS NOTED OTHERWISE, UTILITIES SHOWN ON THE PLAN ARE EXISTING, AND ARE LOCATED <br />TO THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL VERIFY PRIOR TO <br />CONSTRUCTION. IN THE EVENT OF A CONFLICT, THE CONTRACTOR SHALL COORDINATE WITH THE <br />ENGINEER. <br />3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF <br />ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO <br />CONSTRUCTION BY CALLING 811, THE UNDERGROUND LOCATE LINE, A MINIMUM OF 48 HOURS <br />(TWO WORKING DAYS) PRIOR TO ANY EXCAVATION. <br />4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A COPY OF THE APPROVED <br />CONSTRUCTION PLANS ON SITE AT ALL TIMES. <br />5. ANY CHANGES TO THE DESIGN SHALL FIRST BE REVIEWED AND APPROVED BY THE ENGINEER. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />CV-01 <br />QTY-01 <br />G-002 <br />C-100 <br />C-101 <br />C-201 <br />C-400 <br />C-401 <br />C-402 <br />C-501 <br />C-502 <br />C-601 <br />E-101 <br />E-501 <br />RM-01 <br />SP-01 <br />SP-02 <br />DT-01 <br />COVER SHEET <br />SUMMARY OF QUANTITIES <br />LEGEND, ABBREVATIONS, & GENERAL NOTES <br />OVERALL EXISTING SITE PLAN <br />OVERALL SITE PLAN, KEY MAP, AND EROSION AND SEDIMENT CONTROL PLAN <br />CENTERLINE PROFILE NEW ENTRANCE ROAD <br />ENLARGED PLAN NEW ENTRANCE ROAD <br />ENLARGED PLAN NEW ENTRANCE ROAD <br />ENLARGED PLAN TRAILER PARKING <br />SITE SECTIONS AND DETAILS <br />SIGNING AND STRIPING PLAN <br />TRAFFIC CONTROL PLAN <br />ELECTRICAL SITE PLAN <br />ELECTRICAL DETAILS <br />REMOVAL PLAN <br />OVERALL SITE PLAN <br />SITE PLAN <br />DETAILS <br />DWG <br />NO <br />SHEET <br />NO <br />SHEET NAME <br />INDEX TO DRAWINGS <br />01/22/26