My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
You must submit monthly discharge monitoring reports using Ecology's WQWebDMR system. To sign up for <br />WQWebDMR, or to register a new site, go to WQWebPortal Guidance?. If you are unable to submit your DMRs <br />electronically, you may contact Ecology to request a waiver. Ecology will generally only grant waiver requests <br />to those permittees without internet access. Only a permittee or representative, designated in writing, may <br />request access to or a waiver from WQWebDMR. To have the ability to use the system immediately, you must <br />submit the Electronic Signature Agreement with your application. <br />If you have questions on this process, contact Ecology's WQWebDMR staff at WQWebPortal@ecy.wa.gov or <br />800-633-6193 <br />or 360-407-7097 (local). <br />Example Surface Waterbody Outfall location for Section IX: <br />D <br />lake <br />Outfall A: On the NOI application, list the <br />name of the lake and the latitude & longitude <br />where construction stormwater enters the <br />lake. <br />Monitoring Point A* <br />Construction Site <br />Site Boundary <br />Monitoring Paint B* <br />Outfall B: <br />On the NO] application, <br />list the name of the stream and the <br />latitude and longitude where construction <br />stormwater enters the stream. <br />*Note: The monitoring points are for illustration only and are not required on this Notice of Intent application form. <br />Monitoring point information will be entered on the monthly discharge monitoring report as required for active permits. <br />' https:Hecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality-permits-guidance/WQWebPortal- <br />guidance <br />ECY 020-87a (10/2025) <br />
The URL can be used to link to this page
Your browser does not support the video tag.