Laserfiche WebLink
You must submit monthly discharge monitoring reports using Ecology's WQWebDMR system. To sign up for <br />WQWebDMR, or to register a new site, go to WQWebPortal Guidance?. If you are unable to submit your DMRs <br />electronically, you may contact Ecology to request a waiver. Ecology will generally only grant waiver requests <br />to those permittees without internet access. Only a permittee or representative, designated in writing, may <br />request access to or a waiver from WQWebDMR. To have the ability to use the system immediately, you must <br />submit the Electronic Signature Agreement with your application. <br />If you have questions on this process, contact Ecology's WQWebDMR staff at WQWebPortal@ecy.wa.gov or <br />800-633-6193 <br />or 360-407-7097 (local). <br />Example Surface Waterbody Outfall location for Section IX: <br />D <br />lake <br />Outfall A: On the NOI application, list the <br />name of the lake and the latitude & longitude <br />where construction stormwater enters the <br />lake. <br />Monitoring Point A* <br />Construction Site <br />Site Boundary <br />Monitoring Paint B* <br />Outfall B: <br />On the NO] application, <br />list the name of the stream and the <br />latitude and longitude where construction <br />stormwater enters the stream. <br />*Note: The monitoring points are for illustration only and are not required on this Notice of Intent application form. <br />Monitoring point information will be entered on the monthly discharge monitoring report as required for active permits. <br />' https:Hecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality-permits-guidance/WQWebPortal- <br />guidance <br />ECY 020-87a (10/2025) <br />