My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(If the site lacks a street address, list its specific location. For example, Intersection of Highway 61 and 34.) <br />Parcel ID#: (optional) <br />Type of Construction Activity (check all that apply): <br />❑ Residential <br />❑ Commercial <br />❑ Industrial <br />❑ Highway or Road (city, county, state) <br />❑ Utilities <br />❑ Other (specify): <br />Site Acreage <br />Total size of your site/project (that you own/control): acres. <br />Total area of soil disturbance for your site/project over the life of the project: acres. <br />Including grading, equipment staging, excavation, borrow pit, material storage areas, dump areas, haul roads, <br />side -cast areas, off -site construction support areas, and all other soil disturbance acreage associated with the <br />project. (Note: 1 acre=43,560 sq. ft.) <br />Estimated project start-up date (mm/dd/yy): <br />Estimated project completion date (mm/dd/yy): <br />Record the latitude and longitude of the main entrance to the site or the approximate center of site: <br />Latitude: <br />V. Existing Site Conditions <br />Longitude: <br />1. Are you aware of contaminated soils present on the site? ❑ Yes ❑ No <br />2. Are you aware of groundwater contamination located within the site boundary? ❑ Yes ❑ No <br />3. If you answered yes to questions 1 or 2, will any contaminated soils be disturbed, or will any <br />contaminated groundwater be discharged due to the proposed construction activity? ❑ Yes ❑ No <br />("Contaminated" and "contamination" here mean containing any hazardous substance (as defined in WAC <br />173-340-200) that does not occur naturally or occurs at greater than natural background levels.) <br />If you answered yes to Question 3, please provide detailed information with the NOI (as known and readily <br />available) on the nature and extent of the contamination (concentrations, locations, and depth), as well as <br />pollution prevention and/or treatment Best Management Practices (BMPs) proposed to control the discharge <br />of soil and/or groundwater contaminants in stormwater. This should include information that would be <br />included in related portions of the Stormwater Pollution Prevention Plan (SWPPP) that describe how <br />contaminated and potentially contaminated construction stormwater and dewatering water will be managed. <br />ECY 020-87a (10/2025) <br />
The URL can be used to link to this page
Your browser does not support the video tag.