Laserfiche WebLink
SCJ Alliance MEMORANDUM <br />September 26, 2025 Project No. NWG0131 <br />Page 5 <br />greater than about 6 inches maximum dimension. We recommend that Geosyntec observe and <br />evaluate site soils planned for use as structural fill and compaction be completed to at least 95% of <br />the maximum dry density of the material. <br />Closing <br />We appreciate the opportunity to support the design of this Project by providing geotechnical <br />engineering services. Please contact Project manager J. Bodie McCosby, LG at 206-715-3925 or <br />j.bodie.mccosby@geosyntec.com with any questions or comments. <br />