My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) All travel time that relates to the work covered under subsection (2) of this section <br />requires the payment of prevailing wages. Travel time includes time spent waiting to load, <br />loading, transporting, waiting to unload, and delivering materials. Travel time would <br />include all time spent in travel in support of a public works project whether the vehicle is <br />empty or full. For example, travel time spent returning to a supply source to obtain another <br />load of material for use on a public works site or returning to the public works site to obtain <br />another load of excavated material is time spent in travel that is subject to prevailing wage. <br />Travel to a supply source, including travel from a public works site, to obtain materials for <br />use on a private project would not be travel subject to the prevailing wage. <br />(4) Workers are not subject to the provisions of chapter 39.12 RCW when they deliver <br />materials to a stockpile. <br />(a) A "stockpile" is defined as materials delivered to a pile located away from the site <br />of incorporation such that the stockpiled materials must be physically moved from the <br />stockpile and transported to another location on the project site in order to be incorporated <br />into the project. <br />(b) A stockpile does not include any of the functions described in subsection (2)(a) <br />through (f) of this section; nor does a stockpile include materials delivered or distributed <br />to multiple locations upon the project site; nor does a stockpile include materials dumped <br />at the place of incorporation, or adjacent to the location and coordinated with the <br />incorporation. <br />(5) The applicable prevailing wage rate shall be determined by the locality in which the <br />work is performed. Workers subject to subsection (2)(d) of this section, who produce such <br />materials at an off -site facility shall be paid the applicable prevailing wage rates for the <br />county in which the off -site facility is located. Workers subject to subsection (2) of this <br />section, who deliver such materials to a public works project site shall be paid the <br />applicable prevailing wage rates for the county in which the public works project is located. <br />[Statutory Authority: Chapter 39.12 RCW, RCW 43.22.051 and 43.22.270. 08-24-101, § <br />296-127-018, filed 12/2/08, effective 1/2/09. Statutory Authority: Chapters 39.04 and 39.12 <br />RCW and RCW 43.22.270. 92-01-104 and 92-08-101, § 296-127-018, filed 12/18/91 and <br />4/1 /92, effective 8/31 /92.] <br />Supplemental to Wage Rates 11 <br />8/30/2025 Edition, Published August 13, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.