My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM DESCRIPTION <br />34. Cantilever Sign Structure - Cantilever Sign Structure <br />fabricated from steel tubing meeting AASHTO-M-183. See Std. <br />Plans, and Contract Plans for details. The steel structure <br />shall be galvanized after fabrication in accordance with <br />AASHTO-M-111. <br />YES NO <br />M <br />35. Mono -tube Sign Structures - Mono -tube Sign Bridge <br />fabricated to details shown in the Plans. Shop drawings for X <br />approval are required prior to fabrication. <br />36. Steel Sign Bridges - Steel Sign Bridges fabricated from steel <br />tubing meeting AASHTO-M-138 for Aluminum Alloys. <br />See Std. Plans, and Contract Plans for details. The steel <br />structure X <br />shall be galvanized after fabrication in accordance <br />with AASHTO-M-111. <br />37. Steel Sign Post - Fabricated Steel Sign Posts as detailed in Std <br />Plans. Shop drawings for approval are to be provided prior to X <br />fabrication <br />38. Light Standard -Prestressed - Spun, prestressed, hollow <br />concrete poles. X <br />39. Light Standards - Lighting Standards for use on highway <br />illumination systems, poles to be fabricated to conform with <br />methods and materials as specified on Std. Plans. See Specia X <br />Provisions for pre -approved drawings. <br />40. Traffic Signal Standards - Traffic Signal Standards for use on <br />highway and/or street signal systems. Standards to be <br />fabricated X <br />to conform with methods and material as specified on Std. <br />Plans. <br />See Special Provisions for pre -approved drawings <br />41. Precast Concrete Sloped Mountable Curb (Single and <br />DualFaced) X <br />See Std. Plans. <br />Supplemental to Wage Rates 6 <br />8/30/2025 Edition, Published August 13, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.