Laserfiche WebLink
2/6/26, 1:53 PM Journey Level Wages <br />Hard Tail End Dump <br />Power Equipment <br />Articulating Off- Road <br />Operators- Underground $90.09 151 <br />Equipment 45 Yards. & <br />Sewer & Water <br />Over <br />Hard Tail End Dump <br />Power Equipment <br />Articulating Off -road <br />Operators- Underground <br />$89.28 <br />151 <br />Equipment Under 45 <br />Sewer & Water <br />Yards <br />Power Equipment <br />Horizontal/Directional <br />Operators- Underground <br />$88.60 <br />151 <br />Drill Locator <br />Sewer & Water <br />Power Equipment <br />Horizontal/Directional <br />Operators- Underground <br />$89.28 <br />i5J <br />Drill Operator <br />Sewer & Water <br />Power Equipment <br />Hydralifts/boom trucks: <br />Operators- Underground <br />$82.95 <br />7A <br />10 tons and under <br />Sewer & Water <br />Power Equipment <br />Hydralifts/boom trucks: <br />Operators- Underground <br />$86.75 <br />7A <br />over 10 tons <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Leverman <br />$91.94 <br />151 <br />Sewer & Water <br />Power Equipment <br />Loader, Overhead, 6 <br />Operators- Underground <br />Yards. But Not Including 8 <br />$90.09 <br />15.11 <br />Sewer & Water <br />Yards <br />i IFt�-KA <br />11G 8X <br />11G 8X <br />11G 8X <br />11H 8X <br />11H 8X <br />11G 8X <br />11G 8X <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 30/43 <br />