Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Power Equipment <br />Concrete Finish Machine <br />$84.69 <br />151 <br />Operators <br />- Laser Screed <br />Concrete Pump - <br />Power Equipment <br />Mounted Or Trailer High <br />$88.60 <br />151 <br />Operators <br />Pressure Line Pump, <br />Pump High Pressure <br />Concrete Pump: Truck <br />Power Equipment <br />Mount With Boom <br />$90.09 <br />151 <br />Operators <br />Attachment Over 42 M <br />Concrete Pump: Truck <br />Power Equipment <br />Mount With Boom <br />$89.28 <br />151 <br />Operators <br />Attachment Up To 42m <br />Power Equipment <br />Conveyors <br />$88.60 <br />151 <br />Operators <br />Power Equipment <br />Cranes Friction: 200 tons <br />$90.88 <br />7A <br />Operators <br />and over <br />Power Equipment <br />Cranes, A-frame:10 tons <br />$82.95 <br />7A <br />Operators <br />and under <br />Cranes:100 tons through <br />Power Equipment <br />199 tons, or 150' of boom <br />$89.09 <br />7A <br />Operators <br />(including jib with <br />attachments) <br />Power Equipment <br />Cranes: 20 tons through <br />$87.42 <br />7A <br />Operators <br />44 tons with attachments <br />Power Equipment <br />Cranes: 200 tons- 299 <br />$90.00 <br />7A <br />Operators <br />tons, or 250' of boom <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11H 8X <br />11H 8X <br />11H 8X <br />11H 8X <br />11H 8X <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 17/43 <br />