My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />SUBGRADE PREPARATION PW\JA\KITTCO02\ENTRANCE <br />31 23 13 - 2 JUNE 2023 <br />©COPYRIGHT 2023 JACOBS <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION <br />3.01 GENERAL <br />A. Keep subgrade free of water, debris, and foreign matter during compaction or <br />proof-rolling. <br />B. Bring subgrade to proper grade and cross-section and uniformly compact <br />surface. <br />C. Do not use sections of prepared ground surface as haul roads. Protect prepared <br />subgrade from traffic. <br />D. Maintain prepared ground surface in finished condition until next course is <br />placed. <br />3.02 COMPACTION <br />A. Under Earthfill: Three passes with three-wheeled power roller weighing <br />approximately 10 tons. <br />B. Under Pavement Structure, Slabs on Grade, Footings: Compact the upper <br />6 inches to minimum of 98 percent relative compaction as determined in <br />accordance with ASTM D698. <br />3.03 SUBGRADE FOR EMBANKMENT FILL <br />A. Under Earthfill: Compact upper 6 inches to minimum of 95 percent relative <br />compaction in accordance with ASTM D698. <br />3.04 MOISTURE CONDITIONING <br />A. Dry Subgrade: Add water, then mix to make moisture content uniform <br />throughout. <br />B. Wet Subgrade: Aerate material by blading, discing, harrowing, or other <br />methods, to hasten drying process. <br />3.05 TESTING <br />A. Proof-roll subgrade with loaded dump truck or similar heavy-wheeled vehicle <br />weighing approximately 10 tons to detect soft or loose subgrade or unsuitable <br />material, as determined by Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.