My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />TEMPORARY EROSION AND PW\JA\KITTCO02\ENTRANCE <br />SEDIMENT CONTROL JUNE 2023 <br />01 57 13 - 4 ©COPYRIGHT 2023 JACOBS <br />B. Erosion and Sediment Control (ESC) Lead: <br />1. Identify the ESC Lead at the preconstruction discussions and in the <br />SWPPP Plan. The ESC Lead shall have certification in construction site <br />erosion and sediment control from a course approved by Owner. <br />2. The ESC Lead shall implement the SWPPP Plan, including, but not <br />limited to: <br />a. Installing and maintaining all temporary erosion and sediment <br />control Best Management Practices (BMPs) included in the <br />SWPPP Plan to assure continued performance of their intended <br />function. Damaged or inadequate SWPPP BMPs shall be <br />corrected immediately. <br />b. Updating SWPPP Plan to reflect current field conditions. <br />c. Terminating SWPPP Plan. <br />3. When a SWPPP Plan is included in the Contract Plans, ESC Lead shall <br />also inspect all areas disturbed by construction activities, all onsite <br />erosion and sediment control BMPs, all stormwater discharge points, <br />and all temporarily stabilized inactive sites per schedule in the <br />Construction Stormwater Discharge Permit(s) or as directed by <br />Engineer. Complete erosion and sediment control inspection form <br />provided by water resource agency or Owner for each inspection and <br />submit a copy to Engineer no later than end of the next working day <br />following inspection. <br />C. Personnel Training: <br />1. Prior to commencement of construction, applicable personnel must have <br />an understanding of the Construction Stormwater Discharge Permit’s <br />requirements and their specific responsibilities under the permit. At a <br />minimum, personnel must be trained to understand the following as it <br />relates to the scope of their job duties: <br />a. The location of all stormwater controls and how to maintain them. <br />b. Procedures for complying with the pollution prevention <br />requirements. <br />c. Procedures for conducting inspections, recording findings, and <br />taking corrective action. <br />D. Temporary Erosion and Sediment Control Plan (Stormwater Pollution <br />Prevention Plan): <br />1. Contractor is to provide a TESC Plan. <br />2. For each phase of the scheduled work, indicate on the TESC Plan all the <br />BMPs proposed and installed for erosion and sediment control to <br />minimize clearing, stabilize exposed soil, divert or temporarily store
The URL can be used to link to this page
Your browser does not support the video tag.