Laserfiche WebLink
ATTN: General Contractor <br />Concrete Proposal - RFP #3 <br />Date: 1/26/2026 <br />- Project <br />Ellensburg Rodeo Improvements <br />Project Location__ <br />Ellensburg, <br />Washington <br />Item <br />Work Description <br />Quantity <br />Unit <br />Unit Price <br />Amount (US $) <br />1 <br />Stage Relocation To include: <br />Point of Access Moved to Main Entry Stairs <br />1 <br />LS <br />$ 12,397.00 <br />$ 12,397.00 <br />Concrete Pump Truck- Additional Pour at Main Entry Staircase <br />2 <br />EA <br />$ 3,572.00 <br />$ 7,144.00 <br />Construction Joints in Walls/Footings <br />6 <br />EA <br />$ 4,739.00 <br />$ 28,434.00 <br />(4) Larger SQ Footings w/ Additional Rebar <br />6.5 <br />C' <br />$ 1,223.07 <br />$ 7,949.96 <br />Addition of 45 Degree Bends <br />5 <br />EA <br />$ 841.00 <br />$ 4,205.00 <br />Additional Wall Intersections - Transition from Oft Wall to 4ft Wall <br />1 <br />EA <br />$ 983.00 <br />$ 983.00 <br />Additional Wall Intersections - Transition from 7ft Wall to 4ft Wall <br />2 <br />EA <br />$ 983.00 <br />$ 1,966.00 <br />Concrete Stairs <br />1 <br />CY <br />$ 4,144.00 <br />$ 4,144.00 <br />Additional Stage Square Footage <br />4 <br />Cy <br />$ 798.00 <br />$ 3,192.00 <br />Jones Concrete & Excavation <br />Customer: <br />Estimator -Carson Chester <br />Authorized Signature: <br />541-861-8060 <br />Name: <br />Sub Total $ 70,414.9 <br />Date of Acceptance: <br />SALES TAX 0.00% .00 <br />TOTAL $ ,414.96 <br />(Jones Concrete increased price in new COP, <br />ICCC will cover cost difference to honor pricing. <br />$69,725.00 <br />www.JonesConcrete.pro 1/1 <br />