My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k\PC,rerrs <br />REQUEST FOR PROPOSAL NO: 04 SPOKANE <br />203 N 'Mias )ing-on <br />Project Name: Ellensburg Rodeo Arena Completion Suite 400 <br />Owner: Kittitas County Q9201 <br />P 509.838.856e <br />Contractor: Cascade Central Construction <br />0ISCC3TChifeCT 5.VCrr <br />Job Number: 2025-009 Page 1 of 11 <br />TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined <br />below and/or detailed on the attachments referred to: <br />• Revisions to Civil drawings per City review comments. <br />ALSC Architects, P.S. By Todd Keller Date: 1/21/26 <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/ OEDUG-1nl - <br />(cross out one) to the contract sum of: See attached proposal for qualifications. <br />Forty -One Thousand Eight Hundred Six and 43/100 Dollars $ 41,806.43 <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTENDEDYREBbC-EE-Jcross one out) 0 <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. See attached proposal for qualifications. _ / n n <br />Cascade Central Construction By KC Carroll Date 1/25/26 <br />Contractor <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br />ALSC Architects, P.S. By Todd Keller Date: 1 /28/26 <br />PROPOSAL ACCEPTANCE: <br />The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions <br />upon which a Change Order will be issued. <br />Owner <br />By Date <br />ALSC Architects \\ We bring our clients' to life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.