My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riley Eres <br />From: Kyle Miller <kmiller@seaconllc.com> <br />Sent: Monday, October 27, 2025 8:46 AM <br />To: Riley Eres <br />Cc: Adam Adair; Brandon Drexler <br />Subject: Re: [EXTJ U25 R1 1 18A - Kittitas M RW Building <br />Riley, <br />Please see components we have included for material supply in order to install one louver and two <br />ceiling fans supplied by Belsaas. Please let me know if we need to add anything to the list below. <br />Sub Framing Materials, Fasteners, Sealants & Caulk - $500 <br />Freight for Materials - $350 <br />H&H Steel Erectors Labor - $4,400 <br />Patch Tape for Simple Saver Repairs - $50 <br />Sea Con GCs - 8 Hours @ $85/Hour- $680 <br />SUBTOTAL - $5,980 <br />Sea Con B&O PUPD @ 1.49% - $89 <br />Sea Con Fee @ 8% - $486 <br />TOTAL - S6.555-Tax Not Included <br />These roof curbs will not be included in the NBS No Dollar Limit Warranty nor the Sea Con workmanship <br />warranty as the roof curb assemblies are not supplied by NBS or Sea Con. <br />Pricing is assuming you have materials and are ready for this work to be completed before we de-mobe. <br />If a return trip is required, an additional mobe fee will be added to the value above. <br />If you are planning to move forward, please send over a Change Order before the end of this week so I <br />can proceed with getting timing for material delivery to jobsite. <br />
The URL can be used to link to this page
Your browser does not support the video tag.