My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAAS <br />8c <br />SMITH <br />BELSASC0330H <br />October 27, 2025 <br />Re: MRW exhaust fan curbs and louver <br />P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #48 (COP#48). <br />During construction, it was discovered that the exhaust fans were omitted from the roofing <br />plan and therefore not incorporated into the PEMB (Pre -Engineered Metal Building) design. As <br />a result, the originally approved roof curbs were specified as flat, while the project requires <br />sloped roof curbs to properly integrate with the PEMB roof system. <br />This change order proposal includes: <br />Supply of new sloped roof curbs for the exhaust fans. <br />Material and labor to fabricate and install required roof framing supports for the new <br />curbs. <br />Additionally, a louver was omitted from the architectural elevations and only shown on the <br />HVAC drawings. Since it was not included in the PEMB design, additional work is required to <br />provide and install this louver. <br />This proposal includes all materials, labor, and equipment necessaryto install the louver and <br />properly integrate it into the existing wall system. <br />Total Cost added to contract: <br />Time extension required: 12 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$9,755.41 + WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.