Laserfiche WebLink
BELSAA <br />8i[ <br />SMITH <br />BELSASC0330H <br />December 11, 2025 <br />Re: Concrete Grinder Pad <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #51 (COP#51). <br />Per the request of the county, COP #51 includes the labor, materials, and equipment to <br />excavate, prep, form, place rebar, and pour the concrete for the grinder pad that was <br />completed on November 13tn <br />Please see the attached documentation outlining the associated time and material cost for <br />providing the concrete pad. <br />Total Cost added to contract: <br />Time extension required: 0 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$30,933.96 + WSST <br />