Laserfiche WebLink
=1 rmw . <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Transfer Building Ext Lights <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />1 /28/2026 <br />Change # <br />21 <br />Amount: <br />$746.69 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide (2) WP3 fixtures to replace the exterior lights (with the exception of the tunnel ends) on the <br />Transfer Building. Cost includes the fixture, .5 hours of time, and OH&P. <br />Cost Breakdown This Change: <br />Labor <br />$57.50 <br />Material <br />$564.74 <br />Other <br />O&P <br />$124.45 <br />Total <br />$746.69 <br />Authorized By <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />1 /29/2026 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />