My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 rmw . <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Transfer Building Ext Lights <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />1 /28/2026 <br />Change # <br />21 <br />Amount: <br />$746.69 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide (2) WP3 fixtures to replace the exterior lights (with the exception of the tunnel ends) on the <br />Transfer Building. Cost includes the fixture, .5 hours of time, and OH&P. <br />Cost Breakdown This Change: <br />Labor <br />$57.50 <br />Material <br />$564.74 <br />Other <br />O&P <br />$124.45 <br />Total <br />$746.69 <br />Authorized By <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />1 /29/2026 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.