My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gt.co 'ieGp , <br />B E LSA AS`�-.,� <br />SMITH: <br />BELSASC033OH <br />January 29, 2026 <br />Re: TS External Lighting changes <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #60 (COP#60). <br />Per RFI #127 the external lights have been changed to match the external WP3 lights installed <br />on the MRW building. Please see the attached COP #60A for the cost associated with changing <br />those lights. <br />COP# 60B reflects the cost of deleting two external lights and changing the remaining 2 exterior <br />lights to the same fixture type as the lights on the ends of the tunnel. This option was not <br />recommended in the RFI response but per a conversation with the county we felt it was <br />necessary to provide the option. <br />Option A: $1,327.84 + WSST <br />Option B: $ 858.69 + WSST <br />Complete Package: $2,186.53 + WSST <br />Time extension required: 0 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.