My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />BELSAAS'-'.' <br />SMITH `{r <br />P, <br />BELSASCO330H <br />January 26, 2026 <br />Re: LVTS Misc Work <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #63 (COP#63). <br />COP 63 includes pricing for miscellaneous change order work around the project site. This <br />miscellaneous work includes: <br />• Additional concrete ramp into storage room of MRW <br />• Adding plywood to the walls of the MRW trailer room <br />• Additional Concrete curbs needed to provide directional flow on the scales <br />Please see the attached sheets below for pricing breakdowns. <br />Total cost added to contract <br />Time extension required: 0 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$5,106.05+ WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.