Laserfiche WebLink
M M A r, P-Mr-4-1 - - - MIM <br />• Building permits. <br />• Any off-loading . of equipment (if not all ready included in contract). Crane off- <br />loading (need spreader bars) or forklift off-loading. See Haz-Stor off-loading <br />instruction and recommendations manual. <br />41 Foundation design, concrete pad and site location for the free standing <br />materials storage building(s), and all related building supplied equipment. <br />• All shims, fasteners, anchor bolts, grounding and other similar items for <br />securing the storage building(s), loading ramps, electrical transformer (if <br />required) for a complete installation. <br />• Remove any packing materials and tapes (e.g. closed and taped fire dampers). <br />Loading dry chemical fire suppression system activation cartridge (if provided). <br />The installation of the 8' long 5/8' dia. static electricity grounding rod and <br />attachment of supplied conductor (wire) ' ) from rod to the building grounding lug <br />which is located on the bottom.side wall corner of building. <br />Electrical power connections, including but not limited to, electrical wiring, <br />conduit, supports, knock down transformer with local disconnect twitch. Building <br />distribution panel is rated 120/240VAC single phase for eithbr 70 or 100 amp <br />service. See building electrical schematic drawing for exact power requirement. <br />• -Remote wiring such- as -required for plant - interfacing. <br />• Field touch-up painting. <br />Final site inspection, if required, by local authorities. <br />