My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIMROCK <br />Rimrock Landscapes <br />5412 Number 81 Road I Ellensburg, Washington 98926 <br />509-972-7400 1 info@rimrocklandscapes.com I www.rimrocklandscapes.com <br />Sheriff Department Fertilize and apply Pre and post emergent at different 5 $125.00 $625.00 <br />Fertilization times of the year with crabgrass control. This a 5- <br />step application program. <br />Sheriff Department Plug aerate lawn areas. This location does not need 1 $125.00 $125.00 <br />Aeration seed added at this time. This is a one-time per year <br />event. <br />Subtotal $20,175.00 <br />Ellensburg (2.1%) $42168 <br />WA State (6.5%) $1,311.38 <br />Total $21,910.06 <br />Hello Cody, <br />Here is our 2026 pricing for the same sites and services completed last year, <br />-This estimate is valid for 30 days, if accepted beyond 30 days, pricing can change. <br />2 of 2 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.