Laserfiche WebLink
Date Item Number <br />3/4/2026 <br />Reg. O.T. <br />1 30.0 $102.61 $3,078.30 <br />2 20.0 $100.07 $2,001.40 <br />3 20.0 $100.07 $2,001.40 <br />4 12.0 $100.07 $1,200.84 <br />5 15.0 $100.07 $1,501.05 <br />6 20.0 $100.07 $2,001.40 <br />7 2.0 $94.82 $189.64 <br />8 30.0 $66.07 $1,982.10 <br />9 30.0 $66.07 $1,982.10 <br />10 20.0 $62.45 $1,249.00 <br />11 $0.00 <br />15% Markup <br />12 20.0 $137.12 $2,742.40 <br />13 20.0 $124.46 $2,489.20 <br />14 12.0 $84.33 $1,011.96 <br />15 15.0 $56.10 $841.50 <br />16 20.0 $80.18 $1,603.60 <br />17 2.0 $25.32 $50.64 <br />18 30.0 $43.80 $1,314.00 <br />19 40.0 $47.22 $1,888.80 <br />15% Markup <br />20 164.25 LF $46.62 $7,657.34 <br />21 9 EA $165.58 $1,490.22 <br />22 130 LF $34.25 $4,452.50 <br />23 1 LS $500.00 $500.00 <br />24 -1 LS $1,756.39 -$1,756.39 <br />25 150 LF $0.28 $41.33 <br />26 270 LF $0.03 $9.17 <br />27 3,000 SF $0.50 $1,500.00 <br />28 20 TN $18.00 $360.00 <br />29 175 TN $25.00 $4,375.00 <br />15% Markup <br />Date Checked By Date <br />$18,629.16 <br />$2,794.37 <br />Materials Total $21,423.54 <br />Calculated By <br />Total $54,922.27 <br />Scare Tape <br />Sod <br />Crushed Rock <br />Pipe Bedding (Pea Gravel) <br />Materials Subtotal <br />Materials <br />8" DI Pipe <br />Field Lok Gaskets <br />2.5" Copper Pipe <br />Copper Fittings for Connections <br />Tracer Wire <br />HDPE vs Copper Credit <br />1-Ton <br />Equipment Subtotal $11,942.10 <br />$1,791.32 <br />Equipment Total $13,733.42 <br />Skid Steer <br />Roller <br />Pickup <br />138 Excavator <br />Loader <br />Mini Excavator <br />$17,187.23 <br />$2,578.08 <br />Labor Total $19,765.31 <br />Equipment <br />238 Excavator <br />General Laborer <br />Labor Subtotal <br />Operator (Roller) <br />Pipe Layer <br />Pipe Layer (Topman) <br />Operator (Loader) <br />Operator (Mini Exc) <br />Operator (Skid Steer) <br />Labor <br />Foreman <br />Operator (238 Excavator) <br />Operator (138 Excavator) <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Extend 8" Ductile Iron Water (150 LF) to the connection, 2.5" Copper Service (120 LF), Credit to HDPE <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />RFP 05 - Water Revisions per City Comments