Laserfiche WebLink
<br />ALSC Architects \\ We bring our clients’ stories to life. <br /> <br />REQUEST FOR PROPOSAL NO: 05 <br /> <br />Project Name: Ellensburg Rodeo Arena Completion <br /> <br />Owner: Kittitas County <br /> <br />Contractor: Cascade Central Construction <br /> <br />Job Number: 2025-009 <br /> <br />Page 1 of 2 <br /> <br /> <br /> <br />TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined <br />below and/or detailed on the attachments referred to: <br /> <br />• Revisions to Civil drawings per City of Ellensburg direction for new connection point to 12” main instead <br />of 8” line previously noted. <br />• Reconnection of existing water lines from the east to the new water service. <br /> <br /> ALSC Architects, P.S. By Todd Keller Date: 2/09/26 <br /> <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION <br />(cross out one) to the contract sum of: <br /> $ <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________ <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. <br /> By Date <br />Contractor <br /> <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br /> <br /> ALSC Architects, P.S. By Date: <br /> <br />PROPOSAL ACCEPTANCE: <br />The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions <br />upon which a Change Order will be issued. <br /> <br /> By Date <br />Owner <br />0 <br />For Review02/12/2026 8:07:05 AM <br />Cascade Central Construction KC Carroll 3/5/2026 <br />Sixty-Five Thousand One Hundred Sixty-Five and 15/100 Dollars 65,165.15