Laserfiche WebLink
Project Name:McGann COP15 <br />Project No.3/5/2026 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 8 HR $106.95 855.60$ -$ -$ 855.60$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />2" PVC 40 FT -$ $1.14 45.60$ -$ 45.60$ <br />2" PVC coupling 4 EA -$ $1.30 5.20$ -$ 5.20$ <br />2" PVC FA 4 EA -$ $1.56 6.24$ -$ 6.24$ <br />-$ -$ -$ -$ <br />2" PVC bell end 2 EA -$ $9.68 19.36$ -$ 19.36$ <br />-$ $11.85 -$ -$ -$ <br />2" Rigid 90 2 EA -$ $44.30 88.60$ -$ 88.60$ <br />-$ -$ -$ -$ <br />#10 trace wire 50 FT -$ $0.38 19.00$ -$ 19.00$ <br />Handhole 11x18x12 concrete 1 EA -$ $490.45 490.45$ -$ 490.45$ <br />glue, tape, marking tape, corrosion 1 LT -$ $35.00 35.00$ -$ 35.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 855.60$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />855.60$ 709.45$ -$ 1,565.05$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Video Board Fiber RFI 082 <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 15 Fiber Conduit/McGann COP15 video board fiber conduit 3.5Cost Breakdown Issued 3/5/2026