My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 06_ALSC Signed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 06_ALSC Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 1:36:23 PM
Creation date
3/12/2026 1:35:55 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name:McGann COP15 <br />Project No.3/5/2026 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 8 HR $106.95 855.60$ -$ -$ 855.60$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />2" PVC 40 FT -$ $1.14 45.60$ -$ 45.60$ <br />2" PVC coupling 4 EA -$ $1.30 5.20$ -$ 5.20$ <br />2" PVC FA 4 EA -$ $1.56 6.24$ -$ 6.24$ <br />-$ -$ -$ -$ <br />2" PVC bell end 2 EA -$ $9.68 19.36$ -$ 19.36$ <br />-$ $11.85 -$ -$ -$ <br />2" Rigid 90 2 EA -$ $44.30 88.60$ -$ 88.60$ <br />-$ -$ -$ -$ <br />#10 trace wire 50 FT -$ $0.38 19.00$ -$ 19.00$ <br />Handhole 11x18x12 concrete 1 EA -$ $490.45 490.45$ -$ 490.45$ <br />glue, tape, marking tape, corrosion 1 LT -$ $35.00 35.00$ -$ 35.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 855.60$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />855.60$ 709.45$ -$ 1,565.05$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Video Board Fiber RFI 082 <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 15 Fiber Conduit/McGann COP15 video board fiber conduit 3.5Cost Breakdown Issued 3/5/2026
The URL can be used to link to this page
Your browser does not support the video tag.