Laserfiche WebLink
Date Item Number <br />3/4/2026 <br />Reg. O.T. <br />1 2.0 $102.61 $205.22 <br />2 $100.07 $0.00 <br />3 4.0 $100.07 $400.28 <br />4 $100.07 $0.00 <br />5 $100.07 $0.00 <br />6 $100.07 $0.00 <br />7 $94.82 $0.00 <br />8 4.0 $66.07 $264.28 <br />9 4.0 $66.07 $264.28 <br />10 $62.45 $0.00 <br />11 $0.00 <br />15% Markup <br />12 $137.12 $0.00 <br />13 4.0 $124.46 $497.84 <br />14 $84.33 $0.00 <br />15 $56.10 $0.00 <br />16 $80.18 $0.00 <br />17 $25.32 $0.00 <br />18 2.0 $43.80 $87.60 <br />19 4.0 $47.22 $188.88 <br />15% Markup <br />20 Gate Valve 1 $763.84 $763.84 <br />21 Gaskets 2 $12.42 $24.84 <br />22 Flange Adapter 2 $19.71 $39.42 <br />23 Bakup Ring 2 $10.80 $21.60 <br />24 Bolt Kit 2 $6.13 $12.26 <br />25 Saddle 3"x3/4"1 $178.33 $178.33 <br />26 3/4"-1/2" Bushing 1 $4.03 $4.03 <br />27 1/2" Valve 1 $36.28 $36.28 <br />28 Valve Box 1 $107.00 $107.00 <br />29 Valve Top 1 $64.80 $64.80 <br />30 Valve Box Lid 1 $30.28 $30.28 <br />15% Markup <br />Date Checked By Date <br />Materials Subtotal $1,282.68 <br />$192.40 <br />Materials Total $1,475.08 <br />Calculated By <br />Total $3,669.72 <br />Materials <br />1-Ton <br />Equipment Subtotal $774.32 <br />$116.15 <br />Equipment Total $890.47 <br />Skid Steer <br />Roller <br />Pickup <br />138 Excavator <br />Loader <br />Mini Excavator <br />$1,134.06 <br />$170.11 <br />Labor Total $1,304.17 <br />Equipment <br />238 Excavator <br />General Laborer <br />Labor Subtotal <br />Operator (Roller) <br />Pipe Layer <br />Pipe Layer (Topman) <br />Operator (Loader) <br />Operator (Mini Exc) <br />Operator (Skid Steer) <br />Labor <br />Foreman <br />Operator (238 Excavator) <br />Operator (138 Excavator) <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />3" Gate Valve assembly <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />3" Gate Valve Assembly