Laserfiche WebLink
t <br />P.O. Box 119 Wenatchee, WA 98807 <br />Phone: (509)662-7119 Fax: (509)662-4465 <br />Bid Items Quantity Unit Unit Price Amount <br />1 HDPE Credit 1 LS 12,655.02$ $12,655.02 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$12,655.02 <br />$12,655.02 <br />Qualifications: Please Read Carefully <br />1. Washington State Sales Tax has been not been included in proposal. <br />2. Prevailing Wage has been accounted for in proposal. <br />3. <br />4. <br />5. Excludes Water System Support. <br />6. Exludes Construction Survey. <br />7. Engineering & Professional Surveying Services are Excluded. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. Any scope of work not specifically included as a line item in this proposal is excluded. <br />14. <br />15. <br />16. <br /> <br />Sincerely, <br />SELLAND CONSTRUCTION, INC. <br />James Flowers <br />(509) 881-0339 <br />Bid Date: March 4, 2026 <br />Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. <br />Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encountered. <br />Subtotal <br />Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. <br />Ellensburg Rodeo Arena Improvements -HDPE vs Copper Credit <br />Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. <br />Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />Total <br />If you have any questions or need additional information with regard to our proposal please give us a call. <br />Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. <br />Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. <br />Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. <br />Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />SELLAND <br />INC. <br />CONSTRUCTION <br />General Contractors <br />Page 1 of 1