Laserfiche WebLink
Date Item Number <br />2/21/2026 <br />Reg. O.T. <br />1 20.0 $102.61 $2,052.20 <br />2 $100.07 $0.00 <br />3 $100.07 $0.00 <br />4 3.0 $100.07 $300.21 <br />5 20.0 $100.07 $2,001.40 <br />6 $100.07 $0.00 <br />7 $94.82 $0.00 <br />8 $66.07 $0.00 <br />9 $66.07 $0.00 <br />10 20.0 $62.45 $1,249.00 <br />11 $0.00 <br />15% Markup <br />12 $137.12 $0.00 <br />13 $124.46 $0.00 <br />14 3.0 $84.33 $252.99 <br />15 20.0 $56.10 $1,122.00 <br />16 $80.18 $0.00 <br />17 $25.32 $0.00 <br />18 20.0 $43.80 $876.00 <br />19 20.0 $47.22 $944.40 <br />15% Markup <br />20 $0.00 <br />21 $0.00 <br />22 1 LS $1,000.00 $1,000.00 <br />23 8 TN $18.00 $144.00 <br />24 $0.00 <br />15% Markup <br />Date Checked By Date <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />RFI 076 S. Bridge Landing <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Remove and dispose concrete planter box and asphalt. Prep for concrete landing. <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Labor <br />Foreman <br />Operator (238 Excavator) <br />Operator (138 Excavator) <br />Operator (Loader) <br />Operator (Mini Exc) <br />Operator (Skid Steer) <br />Operator (Roller) <br />Pipe Layer <br />Pipe Layer (Topman) <br />General Laborer <br />Labor Subtotal <br />Loader <br />$5,602.81 <br />$840.42 <br />Labor Total $6,443.23 <br />Equipment <br />238 Excavator <br />Pickup <br />138 Excavator <br />Equipment Subtotal $3,195.39 <br />$479.31 <br />Equipment Total $3,674.70 <br />1-Ton <br />Concrete & Asphalt Disposal <br />Crushed Rock <br />Materials Subtotal <br />Materials <br />$1,144.00 <br />$171.60 <br />Materials Total $1,315.60 <br />Calculated By <br />Total $11,433.53 <br />Mini Excavator <br />Skid Steer <br />Roller