My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_FedAidProspectus_Horizontal Curve Project
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Resolution_FedAidProspectus_Horizontal Curve Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 1:36:29 PM
Creation date
3/12/2026 1:35:47 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23
Order
8
Placement
Consent Agenda
Row ID
142644
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />of Way <br />✓❑ No Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the existing right of way. <br />Project Title <br />Horizontal Curve Safety Project <br />❑ Right of Way Needed <br />❑ No Relocation ❑Relocation R <br />Utilities Railroad <br />❑✓ No utility work required ❑✓ No railroad work required <br />❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of <br />of the construction contract the construction contract <br />❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination <br />with the construction contract with the construction contract <br />Date <br />03/02/2026 <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the <br />construction project. <br />rFAA Involvement <br />Ic anv airnnrt located within 3.2 kilometers (2 miles) of the proposed <br />n YPS n No <br />This project has been reviewed by the legislative aoay oT ine aammistraufln aytn wy ui ciyul mica, v, IL <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Date <br />Agency <br />By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 01/2022 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.