My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-26-minutes-ec-study-session
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
2026-01-26-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 1:49:08 PM
Creation date
3/12/2026 1:35:45 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142644
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCASCADE <br />CENTRAL <br />P.O. Box 119 <br />Wenatchee, WA. 98807-0119 <br />Phone 509-662-7119 <br />Fax 509-662-6380 <br />O: <br />Kittitas County Comissioners <br />205 West 5th Ave, Suite 108 <br />Ellensburg, WA 98926 <br />PROPOSAL <br />PROJECT: Ellensburg Rodeo Arena Improvements <br />COP# is <br />DATE: January 15, 2026 <br />TITLE: RFI 015 -Existing Storrnwater System <br />Dm <br />DESCRIPTION <br />OIIANMTY <br />UOM <br />UWT PRICE <br />AMOUtdT <br />1/15/2026 <br />Subcontractor Cost <br />iEarthwork Subcontractor <br />1 <br />LS <br />$ 14,040.00 <br />$14.040.00 <br />6 % Mark-up <br />842.40 <br />Subcontractor - Sub Total <br />14.882.40 <br />1/15/2D26 <br />Cascade Central Construction Cost <br />Supervision <br />0 <br />HR <br />$ 128.18 <br />General Conditions <br />0 <br />WD <br />$ 925.00 <br />$0.00 <br />Project Management & Coordination <br />0 <br />HR <br />$ 161.54 <br />$0.00 <br />Project Engineer <br />0 <br />HR <br />$ 116.25 <br />$0.00 <br />Laborer <br />0 <br />HR <br />$ 63.08 <br />$0.00 <br />Carpenter <br />0 <br />HR <br />$ 119.00 <br />$0.00 <br />15% Mark-up <br />0.00 <br />General Contractor- Sub Total <br />0.00 <br />Subtotal <br />14,882.40 <br />Bond <br />$141.38 <br />B&O Tax <br />$208.35 <br />Schedule Impact: <br />None if approved by 1122/26. <br />Qualifications: <br />COP 15 includes connecting the footing drain line to the existing catch basin <br />per the RFI response. Existing catch basin does not appear to convey <br />elsewhere. Catch basin is full of dirt and could potentially just have a drywell <br />below. Following COP 15 approval, further investigation can be conducted to <br />determine existing condition of the drywell. <br />TOTALI <br />15,232.14 <br />MAKE CHECKS PAYABLE TO: <br />Cascade Central Construction, LLC <br />P.O Box 119 <br />Wenatchee, WA. 98807-0119 <br />THANK YOU FOR YOUR BUSINESSI <br />
The URL can be used to link to this page
Your browser does not support the video tag.