My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-26-minutes-ec-study-session
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
2026-01-26-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 1:49:08 PM
Creation date
3/12/2026 1:35:45 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142644
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. Box 119 Wenatchee, WA 98807 <br />Phone:(509)662-7119 Fax:(509)662-4465 <br />Bid Date: December 17, 2025 <br />SELLAND <br />G rr e} q'a,LCuerrcr sa,,,• <br />E I I e nsburz Rode❑ Arena 1m p rouernents - RFP 01 COP <br />IIuanthy Ue unit Price Amount <br />1 RFP 02 - Electrical Trenching and Backfil; 758 LF $ 30.25 522,929.50 <br />Subtotal 522,929.50 <br />intal $22,4ISS0 <br />Qualifications: Please Read Carefully <br />1. Washington State Sales Tax has been not been included in proposal <br />2. Prevailing Wage has been accounted for in proposal. <br />3. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encountered. <br />4, Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. <br />S. Excludes Water System Support. <br />6. Exludes Construction Survey. <br />7. Engineering & Professional Surveying Services are Excluded. <br />8. Fees for Utilities, County, City, Etc are not included. Cultural Resource Services are not covered in our scope. <br />9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. <br />10. Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />11. Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. <br />12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. <br />13. Any scope of work not specifically included as a line item in this proposal is excluded. <br />14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />15. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. <br />16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />If you have any questions or need additional information with regard to our proposal please give us a call. <br />Sincerely, <br />SELLAND CONSTRUCTION, INC. <br />Ron Zerr III <br />(509)961-7825 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.