Laserfiche WebLink
/_\�5IiEC fS <br />REQUEST FOR PROPOSAL NO: 01 SPOKANE <br />203 N Washington <br />Project Name: Ellensburg Rodeo Arena Completion Suite 400 <br />Spokane, WA <br />Owner: Kittitas County 99201 <br />r 509 838 8568 <br />Contractor: Cascade Central Construction <br />alscarchitects.com <br />Job Number: 2025-009 Page 1 of 6 <br />TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined <br />below and/or detailed on the attachments referred to: <br />Added telecom conduit: <br />• E-101 — Site Plan — Electrical: Removed IT scope from this drawing. <br />• E-101A—Site PLan—Telecommunications: Added sheet in entirety. Includes requested additional <br />telecom conduits and telecom scope previously shown on E-101. <br />• E-102 —Site Plan —Telecommunications: Renamed sheet and associated view to match scope <br />identified within. <br />• E-402 — Enlarged Plans —Telecom Cabinet — Electrical: Revised Telecom Wall Backboard plan to show <br />added telecom conduit stub ups and added cable tray <br />ALSC Architects P.S. By Todd Keller Date: 12/11/25 <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/CIE)N <br />(cross out one) to the contract sum of: <br />Ninety -Five Thousand One Hundred Eighty -One and 67/100 Dollars $ 95,181.67 <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTENDEDff?�(cross one out) _Q_ <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. See attached proposal for conditions. <br />Cascade Central Construction, LLC. By KC Carroll Date 1/13/26 <br />Contractor <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br />ALSC Architects P.S. By <br />PROPOSAL ACCEPTANCE: <br />Date: <br />ALSC Architects \\ We bring our clients' to life. <br />