Laserfiche WebLink
Docusign Envelope lD: 0123E2C2-BCDE-488E-A1A9969O&IFBB3CE <br />BELSAAS & SMITH CONSTRUCTION <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />TIME EXTENTION REQUIRED: <br />NOTICE TO PROCEED REQUIRED BY: <br />SHEET 2 of 2 c.o.P. #18 <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />$ <br />$ 4.082.00 <br />$ 122.46 <br />$ 4.694.28 <br />$ <br />$ 6.994.27 <br />$ 6,994.27 <br />LABOR <br />COST <br />$ 420j5 <br />69.37$ <br />$ 4.694.28 <br />$ 4.694.28 <br />$ 2,299.99 <br />$ 2,000.00 <br />$ 206.00 <br />MATERIAL <br />COST <br />$ 60.00 <br />33.99s <br />$ 2.299.99 <br />$ 2,299.99 <br />$ <br />SUB TOTAL <br />TOTAL <br />SUB <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />EQUIP <br />COST <br />SUB TOTAL <br />LABOR <br />MATERIAL <br />EQUIPMENT <br />SUBCONTRACTORS <br />SUB TOTAL <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL <br />TOTALS FROM PREVIOUS PAGE <br />OVERHEAD 3% <br />PROFIT 1O% <br />BONDING 1.5% <br />SUB TOTAL <br />IIII