Laserfiche WebLink
Timeline of Key Action Items (Quarterly) <br /> CERB Study Draft presented to commissioners <br /> Final CERB report(design of operations included) <br /> Start legislative briefing <br /> Advisory Board Formed <br /> Community Capital Campaign <br /> Ongoing grant writing — "— —�r'L :. ■ r�r <br /> COG hires Econ Dev Director - <br /> Design <br /> f <br /> Phase 1 construction <br /> �ha� �ha coati a a� a CL <br /> Exhibits 12:Estimated Project Timeline <br /> Old Heat CERB Feasibility Study 153 <br />