Laserfiche WebLink
9.Insurance more than statutory limits <br />10.Offloading and storage of detention hardware is excluded. <br />11.Our scope does not include any owner furnished equipment. <br />12.Commercial doors, glass, furniture and hardware are not included. <br />13.All lock Installation and connection are excluded and by others. <br />14.All keys are excluded and by others. <br />15.Installation of any hardware accessories not provided by CTG is not included. <br />16.Sales Tax is not included. <br />GENERAL COMMENTS: <br />1.Base Price includes engineering, submittals, project management, installation and labor, parts, <br />freight, air and vehicle costs, per diem, and one-year warranty on supplied new parts <br />2.Detention Equipment products should be considering a “long lead time” item with some <br />manufacturer provided submittals and products scheduled out to 18 – 22 weeks. TBD <br />3.CTG INCLUDES installation, grouting, and sealant for all detention frames, doors, and glazing. <br />*Many of our competitors will not include this in their scope. Please confirm. <br />4.All jobsite waste removal and associated costs by others. CTG will comply with the contractor’s <br />jobsite waste management plan. <br />5.Retention not to exceed 5% of payment. <br />6.Bonding is not included but available for an additional cost. <br />7.WA State (Kittitas County) prevailing wage rate is included. <br />8.WA State contractor license # CORRETG765BK and WA State UBI # 605-350-406 <br />9.We do not see any addendums for this bid <br />BASE PRICE: $ 79,897. <br />ALTERNATE PRICE: $ 6,603. <br />*Add this cost to the Base Price listed above. Not valid without the Base Price. <br />*Includes installation, testing, training for the owner supplied detention locks (6 to tal). <br />*Includes submittals and corresponding cut ou ts in the detention doors for supplied locks <br />*Door hinges (supplied by others) will be installed and tested by CTG. <br />*Installation of hardware accessories not provided by CTG is not included. <br />Price valid for 30 days <br />“Pricing for all product(s) is based on manufactures & suppliers quotes received by CTG at time of proposal. Due to <br />uncertainty of tariffs, volatility of raw material pricing, and impact to supply chain, final pricing and anticipated <br />delivery for this product(s) will need to be updated at time of CTG order to supplier, and purchase orders/contracts <br />adjusted. Tariff payment is required for release of material by US Customs and Boarder Protection (CBP). CTG will <br />invoice in advance for an anticipated tariff fee, and terms will be due on receipt. This will allow CTG to pay a tariff <br />fee and have materials released. Standard invoicing and terms will apply CTG invoices for labor and materials” <br />Kirk Hansen <br />Director of Sales <br />Corrections Technology Group (CTG) <br />Docusign Envelope ID: 5762FAD2-D9D7-475C-BD85-EC6F1FA775E1