Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #16 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE -$ 86,500.00$ (49,743.00)$ (420.00)$ <br />OVERHEAD 3%-$ 2,595.00$ (1,492.29)$ (12.60)$ <br />PROFIT 10%-$ 8,909.50$ (5,123.53)$ (43.26)$ <br />BONDING 1.5%-$ 1,470.07$ (845.38)$ (7.14)$ <br />SUB TOTAL -$ 99,474.57$ (57,204.20)$ (483.00)$ <br />SUB TOTAL -$ 99,474.57$ (57,204.20)$ (483.00)$ <br />LABOR (483.00)$ <br />MATERIAL (57,204.20)$ <br />EQUIPMENT -$ <br />SUBCONTRACTORS 99,474.57$ <br />SUB TOTAL SUB TOTAL 41,787.37$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 41,787.37$ <br />TIME EXTENTION REQUIRED: TBD <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />Docusign Envelope ID: 5762FAD2-D9D7-475C-BD85-EC6F1FA775E1