Laserfiche WebLink
J-U-B Agreement for Professional Services <br />Attachment 1A – Detailed Scope of Work Page 1A-2 <br /> SCOPE OF SERVICES BY J-U-B <br />J-U-B’s Services under this Agreement are limited to the following tasks. Any other items necessary to plan <br />and implement the project, including but not limited to those specifically listed in PART 3, are the <br />responsibility of CLIENT. <br /> Task 010: Project Initiation <br /> Conduct a Pre-Design meeting with CLIENT and FAA via teleconference. The meeting will be held <br />to determine the project scope elements. The FAA Predesign Conference Checklist will be the <br />guide for project discussions. Minutes of the Predesign meeting will be compiled and forwarded to <br />the FAA and CLIENT. <br /> Assist the CLIENT with Project Scope development and initiation. J-U-B will prepare a Scope of <br />Services narrative and detailed description of all work tasks for CLIENT and FAA review and <br />approval. Discuss review comments and revise accordingly. <br /> Prepare a listing of work tasks in a spreadsheet with person-hours, hourly rates, expenses, and <br />costs based on the Scope of Services. This spreadsheet will be used for both J -U-B and the <br />Independent Fee Estimator (IFE). J-U-B shall prepare a detailed cost proposal on the spreadsheet, <br />based on estimates of work to accomplish the Scope of Services. Provide the CLIENT and the <br />Independent Fee Estimator (IFE) with the blank person-hour spreadsheet, Scope of Services, <br />Project Layout Map, and overall concept level project estimate. A teleconference will be held with <br />the IFE CONSULTANT only if specific clarifications are needed on the proposed project Scope of <br />Services. The CLIENT may be on the phone call and costs must not be discussed. <br /> J-U-B shall assist the CLIENT with Record of Negotiations documentation. <br /> Prepare an Agreement for Professional Services for submittal and review by the CLIENT and FAA, <br />including the FAA Professional Service Agreement Checklist. The Agreement shall be <br />comprehensive in description of services and responsibilities of all contract parties. <br /> Assist CLIENT with preparation and submittal of an FAA Grant Application for Federal Assistance <br />for the project, including estimated project costs, drawings, and a schedule for FAA submittal prior <br />to beginning of the project. <br /> Assist CLIENT in the submittal of FAA Sponsor Certifications. These include the “Selection of <br />Consultants”, “Project Plans and Specifications”, “Drug Free Workplace”, “Equipment/Construction <br />Contracts”, “Disclosure Regarding Potential Conflicts” and “Construction Project Final Acceptance”. <br /> Provide Project Management during this phase (approximately 4-month duration) including <br />CLIENT, FAA, State Division of Aeronautics, and J-U-B team communication and coordination; <br />monthly invoicing; project planning; regular monitoring of project status, budget, and schedule; on- <br />going document handling and filing. <br /> Attend two (2) meetings with the Airport manager (assume one at J-U-B office and one at airport) <br />during this phase of the project in order to keep management and County abreast of the progress <br />of the project. <br /> Assist CLIENT in preparation and processing of bi-monthly Request for Reimbursement (RFR) by <br />submitting data as required. It is anticipated that J-U-B will prepare and process one (1) set of RFR <br />‘packages’ on behalf of the CLIENT for this phase of the project. J-U-B will provide documentation <br />of costs for CLIENT review including invoices and reimbursing spreadsheets. J -U-B will complete <br />the RFR using the Delphi System upon receiving authorization from CLIENT. <br /> Task 020: Design <br /> Investigate the proposed job site at the Airport. Allow civil design personnel to become familiar <br />with the proposed job site. Take photographs, perform a visual survey of the pavement areas, and <br />otherwise document findings of visit. Take a survey of the airport and sample the pavement areas <br />to quantify the cracks that will have to be filled during the project.