My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-19-minutes-finance-study-session
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-02-19-minutes-finance-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:32:53 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rodeo Arena Seating Project <br />Change Order <br />Number <br />COP# <br />Cost <br />Description <br />Status <br />Base <br />$ 5,030,000.00 <br />Base Bid <br />Contract <br />Added to <br />contract <br />Alternate <br />$ 35,000.00 <br />Additive Alternate <br />Contract <br />CO 1 <br />1 <br />$ 9,211.93 <br />Temporary Fiber <br />Approved <br />CO1 <br />2 <br />$ 1,182.24 <br />Existing RV Outlet Jbox <br />Approved <br />C011 <br />3 <br />$ 12,517.81 <br />Buckaroo Grandstand Receptacles <br />Approved. <br />4 <br />feieeu ChangeS&Addftiams <br />Revise and resubmit <br />CO2 <br />413 <br />$ 95,181.67 <br />Telecom Changes & Additions <br />Approved <br />CO1 <br />5 <br />$ 24,059.39 <br />Buckaroo Press Box Panel <br />Approved <br />CO1 <br />6 <br />$ 7,208.00 <br />Megaphone lowering <br />Approved <br />7 <br />$ - <br />Stadia footings, 400,662.94 <br />In review <br />713 <br />713823.59 <br />7R2 <br />$ 678,651.17 <br />Stadia footings, and overtime <br />CO2 <br />8 <br />$ 15,220.74 <br />Existing Feeder Investigation & replace to Vault <br />Approved <br />CO2 <br />9 <br />$ 6,397.41 <br />First Aid Station Refeed removing NonCode compliance <br />Approved <br />10 <br />Event Lighting Clarification- Non Compliant existing wiring <br />CO2 <br />10R <br />$ 37,750.00 <br />Event Lighting Clarification - <br />Non Compliant existing <br />wiring <br />11 <br />Buckaroo Seating curcuit breaker and switch to be added <br />CO3 <br />11R <br />$ 7,573.49 <br />Buckaroo Seating curcuit breaker and switch to be added <br />12 <br />3 RV Hydrants and Revision to Concourse slabs at stadia <br />003 <br />12R <br />$ 65,888.37 <br />3 RV Hydrants and Revision to Concourse slabs at stadia <br />13 <br />Stage redesign $197,203.21 <br />004 <br />13R <br />$ 196,742.12 <br />Stage redesign <br />14 <br />Footing Required at HSS RFI 38 <br />CO2 <br />14R <br />$ 4,620.63 <br />1 <br />Approved <br />002 <br />15 <br />$ 15,232.00 <br />Tie in existing storm water system <br />Approved <br />16 <br />$ - <br />Expedite Schedule 502,243.68 <br />T&M <br />CO3 <br />17 <br />$ 41,806.43 <br />Pipe Change per city requirements. <br />CO2 <br />$ (4,290.45) <br />Sales tax on CO1 <br />CO4 <br />18 <br />Hardware for exiting and new Mirrors <br />19 <br />$ 58,301.31 <br />Electrical Utility connects to City <br />20 <br />$ 16,416.86 <br />Luminaire & Receptacle Attachment <br />21 <br />$ 67,356.50 <br />Additional water line to connect to new location required by <br />City of Ellensburg <br />22 <br />$ 4,377.75 <br />1 Arena Safety Steps <br />23 <br />729.06 Painting 6 recepticals <br />24 <br />$ 732.31 <br />FRP Behind Mop sink <br />
The URL can be used to link to this page
Your browser does not support the video tag.