Laserfiche WebLink
7 TITAN <br />ELECTRICALIN <br />21S Ke'Ys did. Ya'-A64 � 9+39_�' <br />569.941.8306 1I1ANLLU RU <br />TO: Riley Eres <br />Client Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Contractor Titan Electrical LLC <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />CHANGE TITLE I Transfer Building Compressor Circuit <br />COST IS TO: <br />Date: <br />12/22/2025 <br />Change # <br />22 <br />Amount: <br />$1,617.60 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Total cost includes the materials and installation of the additional compressor circuit for the Transfer <br />Building. Approximately 60' of EMT conduit, conductors, a circuit breaker, and all other associated <br />fittings were included. <br />Credit Breakdown This Change: <br />Labor <br />$1,118.95 <br />Material <br />$229.05 <br />Other <br />O&P <br />$269.60 <br />Total <br />$1,617.60 <br />Authorized By: <br />Titan Electrical LLC <br />CONTRACTOR <br />Signature: <br />Print Name: <br />Adam Rieker <br />Title: <br />Project Manager <br />Date: <br />12/22/2025 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />