Laserfiche WebLink
[� TITAN 215 Keys Rd <br />Yakima, WA 98901 PCO #010 <br />509-941-8306 <br />Lower Valley Transfer Station <br />Date: <br />9/23/2025 <br />Days Allowed for Response: <br />10 <br />To: <br />Riley Eres <br />Requested Response Date: <br />From: <br />Adam Rieker <br />Sent VIA: <br />Email <br />Action Notes: Compressor Potential Cost <br />Potential Time <br />Spec <br />Section/Title: <br />Total cost includes the materials and installation of the additional compressor circuit for the MRW building. <br />Approximately 60' of EMT conduit, conductors, a circuit breaker, and all other associated fittings were included. <br />Materials: $223.13 <br />Labor: $1,055.70 <br />OH&P: $255.76 <br />TOTAL COST - $1,534.59 <br />Response: <br />Answered By: Response Date: <br />Distribution of Response <br />Copies <br />Sent Via <br />By: <br />Field File <br />Project File <br />