Laserfiche WebLink
„ Northwest Linings and Geotextile Products. Inc <br />Kent, Washington <br />■ 0:(253) 872-0244 • wwvw.norttttivestlininss.coni <br />14 <br />License: <br />WASH INGTON # C'001-NORTHLG189J6 <br />Veteran Owned <br />Date: Aug 1, 2024 <br />Revised: Aug 5"', 2025 <br />Rel iced: Aug I I'll, 2015 <br />Attention: Estimating Department <br />Reference: Kittitas County Lower Valley'rransfer Station <br />Subject: 60-mil HDPE textured liner: 300-mil Geotet: l0oz/sy nonwoven geotextile fabric <br />Northwest Linings can install the following geosynthctic materials for the above referenced project as follows: <br />Bid Item Description UoM Qtv Unit Price Ext. Price <br />37. Contact Water Pond LS i - $ 195,541.00 <br />Pond 1 <br />Approximately 28.461 sfof 60-mil HDPE textured liner supplied and installed (prirrrarr) - liucludes ballast pocket capstrip) <br />Approximately 25,734 sf of 300-mil Geonet supplied and installed (leak detection lamer) <br />Approximately 23,732 sf of 60-mil HDPE textured liner supplied and installed (wecondarr) <br />Approximately 25,691 sf of I Ooz/sy nonwoven geotextile fabric supplied and installed (below liner srstern) <br />1,000 sandbags as temporary ballast <br />Zero (0) pipe penetrations <br />Zero If of liner to concrete attachment <br />,,2., r-1; , 4z, inn mil HOPE Rub glie i,; ins... im kh A "halh,.., pipe.Wo-ops <br />p <br />2,022 if of extrusion welding (at leak detection sump, peritneter of priurarr liner, and TOE ballast pockets) <br />Pond 2 <br />Approximately 28,461 sfof 60-mil HDPE textured liner supplied and installed (prinramy) - (includes ballast pocket capsn-ipr <br />Approximately 25,734 sfof'300-mil Geonet supplied and installed (leakdeteclion /aver) <br />Approximately 23.732 sfof 60-mil HDPE textured liner supplied and installed (wecondwy) <br />Approximately 25,691 sf of I Ooz/sy nonwoven geotextile fabric supplied and installed (below liner sPj wtetrt) <br />1,000 sandbags as temporary ballast <br />One (1) pipe penetration 6” OD or less <br />Zero If of liner to concrete attachment <br />2.022 If of extrusion welding (at leak detection sump, perinreter of prinrcrrr• liner, and TOE hallast packers) <br />Northwest Linings acknowledges the receipt of the following Addenda: 1, 2, 3 and 4. <br />Equipment & Operator (please refer to page three for more information): <br />Customer (General Contractor / Owner) would be responsible for providing a piece of heavy equipment for NW Linings (loader or <br />forklift capable of lifting 8,000 lb and accessing the area to be lined) and operator for 10 days to stage and deploy material with <br />the Northwest Linings crew. For unloading see project site support sheet attached. <br />Equipment, operator, and labor required to unload NWL truck of material at the site, prior to NWL crew arrival, to be provided by <br />others. <br />Prices are FOB jobsite and do not include taxes, fees, or bonding (unless otherwise noted). <br />Northwest Linings bonding rate for this project: additional 1.5% <br />Number of mobilizations included in this bid: 2 additional mobilization(s): S 3,250 each <br />This quote is valid for 14 days from the date of this bid and is based on: <br />® Private Wages [IPublic Wages; Classification: General Laborer <br />Northwest Linings and Geotextile Products, inc. is a non -union open shop. Unless noted otherwise, this proposal does not include <br />union fees, labor, or agreements. NWL is willing to enter into a one-time/site-specific agreement as needed for an additional cost. <br />There may be an additional charge for the cost of freight at shipping if materials are not shipped within the validity of this quote. <br />Sincerely, <br />Accepted by: <br />Jared Kacoroski Name: <br />Estimating Company: <br />Northwest Linings & Geotextile Products, Inc. Date: <br />"Hpininn fin Prntprt the Ft7virnnn7p17t Sinrp 1973" <br />