Laserfiche WebLink
A <br />'V1 <br />VALLEY STEEL. WORKS, LLC <br />4530 Badger Packet Rd <br />Ellensburg, WA 98926 <br />509-306-2119 <br />valleysteelworlcs@gtnail. corn <br />I Name / Address I <br />Belsaas & Smith Construction <br />P.O. Box 926 <br />Ellensburg, WA 98926 <br />Estimate <br />Date <br />Estimate # <br />3/12/2025 <br />E24023 COPY <br />Project <br />24015 Transfer Station <br />Item <br />Description <br />Qty <br />Rate <br />Total <br />CHANGE ORDER <br />September 13, 2025 <br />> Decreased quantity of Fabrication from 420 to 402. <br />Decreased price of Fabrication from $52,500.00 to <br />$50,250.00. (42,250.00) <br />> Decreased quantity of Mobile Welding from 500 to <br />482. Decreased price of Mobile Welding from <br />$92,500.00 to $89,170.00. (-$3,330.00) <br />> Decreased price of Material from $136,091.32 to <br />$126,016.32. (-$10,075.00) <br />> Decreased quantity of Fabrication from 275 to 230. <br />Decreased price of Fabrication from $34,375.00 to <br />$28,750.00. (-$5,625.00) <br />> Decreased quantity of Mobile Welding from 350 to <br />335. Decreased price of Mobile Welding from <br />$64,750.00 to $61,975.00. (-$2,775.00) <br />> Decreased price of Material from $66,864.45 to <br />$65,691.45. (41,173.00) <br />Total change to estimate 425,228.00 <br />Quote includes material, fabrication, and installation. <br />50% deposit required to begin project. <br />Subtotal <br />Sales Tax (8.6%) <br />Total <br />Page 5 <br />